BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Renovation of a water / sewer project in Buffalo, New York. Completed plans call for the renovation of a water / sewer project.

Bird Island Wastewater Treatment Facility Primary Treatment Renovation Project Location Bird Island Wastewater Treatment Facility, Buffalo, NY. Questions in writing will be received from Plan Holders through March 18, 2024, and all questions will be responded to in writing by March 23, 2024. Certified Check or Bond. No proposal or bid will be considered unless it is accompanied by a check duly certified by an incorporated bank or trust company payable to the Buffalo Sewer Authority, in the amount of not less than five per cent (5%) of the bid. or, in lieu of such check, by a bid bond prepared on the form of Proposal Bond attached hereto, payable to the Buffalo Sewer Authority, The Contractor shall commence work on a date to be specified in a written order of the Authority as the date of such commencement. Heishe shall fully complete the whole of the work, except permanent restoration of street surfaces, by December 1. 2028. for Contract A and Contract B. It is anticipated that the Authority will notify the Contractor on writing to start and proceed with this work no later than December 31. 2024 The Contractor shall wholly complete permanent restoration of streets surfaces within twenty (20) consecutive calendar days from date Authority notifies the Contractor in writing to proceed with this work The above periods of time will be extended only by written consent of the Authority. LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE WORK In case the Contractor shall fail to fully complete the whole work in the Agreement to the satisfaction of the Authority within the time limits specified under the heading Time for Completion, the Contractor shall and will pay to the Buffalo Sewer Authority the sum of ssoomo for each any every successive day, Sundays and holidays included, after the above specified time, for the next succeeding sixty (60) days. The Buffalo Sewer Authority reserves the right to reject any or all Bids or to waive any informality in the Bidding.

Under Construction

Water / Sewer

$37,855,000.00

Public - City

Renovation

295

42

141

10

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
291
Bidding Soon
4,837
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

December 31, 2024

Project location map

9 Black Rock Harbor Rd, Buffalo, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.