Published March 10, 2024 at 7:00 PM

Updated March 11, 2024

Site work for a water / sewer project in Ann Arbor, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000342644 Question Acceptance Deadline 02/21/2024 05:00 PM EST All questions regarding this Request for Proposal (RFP) shall be submitted via e-mail. Questions will be accepted and answered in accordance with the terms and conditions of this RFP. Scope of Work/Proposal Content questions shall be e-mailed to Tracy Anderson, PE, Project Manager - Tanderson@a2gov.org RFP Process and Compliance questions shall be e-mailed to Colin Spencer, Buyer - CSpencer@a2gov.org The purpose of this Request for Proposal (RFP) is to select a firm to provide construction services for the 2024 Miscellaneous Utilities Project. The Project consists of two separate projects each with their own plan set to be completed under one construction contract. The two projects are described below. 2024 Miscellaneous Utilities Project (Huron View, Orkney, and Culver Water Main): The project includes installing 20-inch water main on Huron View Blvd. between Main St. to about 200 feet west of the cul-de-sac; this will replace two (2) 16-inch mains that will be abandoned. The water main will be jack and bored under Main Street. Some storm sewer and catch basin replacements will be included. The entire road will be resurfaced. The project also includes installing 8-inch water main on Orkney Dr. Culver Rd. and Fountain St, from Sunset Rd. to Fountain St. Water main is the only utility to be installed. Only curb that must be removed for the water main is to be removed and replaced. The existing 6-inch water main will be abandoned, and the water main trench will be paved, the entire road is not to be resurfaced. Ann Arbor Railroad/Boardwalk Culvert: The project consists of removing 90-inch storm sewer and installing a 90x48-inch precast concrete tee structure to alleviate erosion behind 2400 Boardwalk Dr. This includes removal of 54" abandoned storm sewer, construction of a temporary drive and mud mat for access to the site, reconstruction of a flow channel in an existing structure, and regrading and placing rip rap on the surrounding channels. Each bid must be accompanied by a certified check or Bid Bond by a surety licensed and authorized to do business within the State of Michigan, in the amount of 5% of the total of the bid price. The City reserves the right in its sole and absolute discretion to accept or reject any or all proposals, or alternative proposals, in whole or in part, with or without cause. All proposals received on or before the due date will be publicly opened and recorded on the due date. No immediate decisions will be rendered. Question Deadline 02/21/2024 at 5:00 PM ET The Contractor shall begin the work of this project on or before May 6, 2024.

Bid Results

Water / Sewer

$3,636,327.00

Public - City

Site Work

58

5

9

6

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
131
Bidding Soon
2,519
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

May 6, 2024

Project location map

Multiple Locations, Ann Arbor, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.