Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 14, 2024 at 8:00 PM

Updated March 15, 2024

Site work, paving and new construction of a mixed-use development in San Diego, California. Completed plans call for the construction of a fire / police facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City is seeking to acquire Design-Build services for the design and construction of a new, permanent, 11,500 square feet, 3-bay fire station. The project site is located on the westerly corner lot of Carmel Valley Road and Winecreek Road intersection in the Black Mountain Ranch community. The facility will accommodate: three (3) fire apparatus and a crew of nine (9) to eleven (11) fire personnel; onsite surface parking; dorm rooms; kitchen; watch room; training room; ready room; station alerting system; IT data network; wet and dry utilities; electrical; mechanical; and all other necessary infrastructure associated with this project. In addition, the offsite improvements include, but are not limited to site grading; pad preparation; water main construction and utility relocation; street/traffic improvements within the public right-of-way along Carmel Valley Road and Winecreek Road to allow for emergency response apparatus' egress & ingress. Due to the project site located near Multi- Habitat Planning Areas (MHPA), the project will require discretionary permits, surveys, studies, and monitoring, to meet all land use and environmental regulations. A long-term maintenance & monitoring agreement will be required for post-construction up to 25 months. Pre-Bid Meeting No Online Q&A No License Requirements B Project Type RFQual (Request for Qualification) Response Types Response File Work Force Report (required) Contractors Certification of Pending Actions (required) Mandatory Disclosure of Business Interests Form (required) Prime Contract - Debarment and Suspension (required) Type of Award Lump Sum Questions received less than 14 Days prior to the Statement of Qualifications due date may not be considered.s. All questions related to this solicitation shall be submitted to: RRiego@sandiego.gov

Post-Bid

Fire / Police

$32,000,000.00

Public - City

New Construction, Paving, Site Work

3

6

2

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
616
Active Projects
249
Bidding Soon
3,723
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

November 13, 2024

Project location map

Winecreek Rd & Carmel Valley Rd, San Diego, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed