BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2024 at 8:00 PM

Updated August 13, 2024

Site work and new construction of a military facility in Virginia Beach, Virginia. Completed plans call for the construction of a military facility; and for site work for a military facility.

Definitization of Equitable Adjustments for Change Orders under Construction Contracts There are no agency-specific policies and procedures that apply to the definitization of equitable adjustments for change orders under construction contracts. Current data regarding the timely definitization of equitable adjustments for change under construction contracts awarded by the Department of the Navy is available as of the date of this solicitation, provided as Attachment R - DON_REAs Location of the work: Joint Expeditionary Base Little Creek - Fort Story (JEBLCFS), Little Creek Site, Virginia Beach, VA The Government intends to award a firm-fixed price task order. Description of the work: Reference the Specifications (Attachment A), Drawings (Attachment B), Schedule of special inspections (Attachment C), Statement of special inspections (Attachment D), Utility Permit (Attachment E) and Submittal register (Attachment F). The Contractor shall provide supervision, labor, material, and equipment required to perform all work for the following project: P602U MSRON TWO Combatant Craft Maintenance Facility, JEBLCFS, Little Creek site, Virginia Beach, VA 23459-8616. Time for completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984), all work and options shall be completed within 375 calendar days after award. Estimated Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range is between $1,000,000 and $5,000,000. NAICS Code: 236220 - Commercial and Institutional Building Construction Wage Determination: General Decision Number VA20240167 01/05/2024 (Attachment G) as of the date of this RFP. Should this wage determination be modified by DoL prior to award, the most current wage determination may be issued via amendment. Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,484.00 for each calendar day of delay until the work is completed or accepted. Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,484.00 for each calendar day of delay until the work is completed or accepted. PPI's due: March 5, 2024 at 1400 hours EST PPIs must be submitted electronically via Pre-Proposal Inquiry Form (Attachment L), to Gina Moriarty at gina.c.moriarty.civ@us.navy.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Military

$4,976,765.00

Public - Federal

New Construction, Site Work

78

26

14

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
49
Bidding Soon
781
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

August 23, 2024

Project location map

To Be Determined, Virginia Beach, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.