BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Clifton, Tennessee. Completed plans call for the renovation of a detention facility.

SCOPE a. Removal of the existing frames and doors: i. Remove the existing frames, doors, hinges, and locks. ii. Dispose of the removed frames, doors, hinges, and locks. b. Installment of the new frames and doors: i. Provide new 12 gauge type 303 stainless steel frames sized and prepped for new hinges and door locks as required. ii. Due to age, condition, and varying sizes of the door openings, Contractor shall be responsible for all exact measurements needed. iii. Measurements of the shower doors that will be provided by the State and installed by the Contractor are listed at the end of these specifications. The quantities are as follows: a. SDL1-2415-LH = six (6) each b. SDL2-2415-LH= two (2) each C. SDR1-2232-RH= three (3) each d. SDL1-2232-LH = one (1) each e. Total = twelve (12) doors iv. Installation of the pre-purchased doors, hardware, glass, and locks in accordance with industry standards guaranteeing precise alignment, proper fit, and optimal functionality. v. Prior to completing the installation and leaving the work site, installing technician(s) shall test the 12 doors to ensure all are operational. This shall be completed with a representative of SCCF present. vi. Any defects discovered during this testing shall be the responsibility of the Contractor to fix. All work shall to be performed in in a professional and neat manner. The Contractor shall be responsible for removing existing doors/frames and installing new doors/frames. New frames shall be anchored through the frame into the block wall with expansion anchors and grouted in place. Doors shall swing in same direction as the current doors. The Contractor shall be responsible for all clean up after each visit. The Contractor shall be responsible for disposing of existing doors/frames, hardware, and all other job-related debris. The State will be responsible for supplying the shower doors and hardware for the Contractor to install.

Post-Bid

Jails / Prisons

$80,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
76
Bidding Soon
998
All Active Projects
448
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 13, 2024

April 15, 2024

img_map_placeholder

555 Forrest Ave, Clifton, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.