Site work for a water / sewer project in Clifton, Tennessee. Completed plans call for site work for a water / sewer project.
A. The project consists of: 1. Intake Structure: o Screen o Intake piping, casing pipe, and fittings o Pump, strainer, and motor o Intake Vault/Structure o Interior piping, fitting, and valves including air vacuum valves, check valves, and butterfly valves o Electrical Control Building 2. 12" PC350 DIP Raw Water Transmission Line, 6" and 12" PC350 DIP Finished Water Lines 3. Water Treatment Plant: o Ceramic Membranes o Clearwell o High Service Pumps o Electrical Room and Equipment o Office and Control Room o Chemical Room and Equipment o Laboratory o Bathroom o Break/Training Room o Parking Lot, Access Drive, and Sidewalk o Site grading o Storm and Sanitary o Pavement and sidewalk The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. All bidders must be licensed General Contractors as required by the Contractors Licensing Act of 1994 of the General Assembly of the State of Tennessee, and qualified for the type of construction being bid upon. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. "PLEASE NOTE: The estimated value listed for this project is for searchability purposes only and does not reflect the actual construction budget as determined by the owner. It should not be used for estimation purposes at this time." The MBE fair-share goal is 2.6% for construction and 5.2% for supplies, services, and equipment. The WBE fair share goal is 2.6% for construction and 5.2% for supplies, services, and equipment. Question Deadline 08/19/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Contact: Cory Borum at Cory.Borum@hdengr.com with written questions . Questions received less than seven days prior to the date for opening of Bids may not be answered.
Bid Results
Water / Sewer
$25,800,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2025
September 25, 2025
Multiple Locations, Clifton, TN
Related To This Project
Clifton, TN
--
Clifton, TN
Bid Date: Aug 13 2025
Clifton, TN
Bid Date: Feb 17 2025
Clifton, TN
Bid Date: Dec 10 2024
Clifton, TN
Bid Date: Dec 20 2024
Clifton, TN
Bid Date: Jun 13 2024
Clifton, TN
Bid Date: Apr 23 2024
Clifton, TN
Bid Date: Mar 13 2024
Clifton, TN
Bid Date: Jan 18 2024
Clifton, TN
Bid Date: Nov 27 2023
Clifton, TN
Bid Date: Aug 09 2021
Clifton, TN
Bid Date: Oct 03 2023
Clifton, TN
Bid Date: Dec 15 2021
Clifton, TN
Bid Date: Nov 29 2023
Clifton, TN
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.