BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2024 at 8:00 PM

Updated March 29, 2024

Renovation of a detention facility in Las Vegas, Nevada. Completed plans call for the renovation of a detention facility.

Base Bid Description: Replace existing generator with larger unit and modify the existing main electrical switchboard. Contract Time: 60 calendar days. Liquidated Damages: $922.00 per day. Prevailing Wages must be paid on this project. Source Limitations: Same manufacturer as transfer switch in which installed. 2. Functional Description: Remote annunciator panel shall annunciate conditions for indicated transfer switches. 3. Annunciation panel display shall include the following indicators: a. Sources available, as defined by actual pickup and dropout settings of transferswitch controls. b. Switch position. c. Switch in test mode. d. Failure of communication link. 4. Annunciator Panel: LED-lamp type with audible signal and silencing switch. a. Indicating Lights: Grouped for each transfer switch monitored. b. Label each group, indicating transfer switch it monitors, location of switch, and identity of load it serves. c. Mounting: Flush, modular, steel cabinet unless otherwise indicated. d. Lamp Test: Push-to-test or lamp-test switch on front panel.

Post-Bid

Jails / Prisons

$1,286,795.00

Public - State/Provincial

Renovation

12

8

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
4
Bidding Soon
419
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

May 27, 2024

Project location map

5730 Range Rd, Las Vegas, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.