BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in West Fargo, North Dakota. Completed plans call for site work for a water / sewer project.

As of April 3, 2024 project was awarded to Sellin Brothers, Inc., but awarded amount is not available. The Project consists of installing 3" HDPE communication conduits, 4" HDPE electrical conduits, 8" HDPE watermain and gate valves, and 6" and 8" HDPE sanitary sewer force main and plug valves. Bids will be received for a single Contract. Bids will be on a unit price and lump sum basis. This Project will be 100 percent funded by a combination of North Dakota State Water Commission funds, City of Fargo sales tax revenues, and Cass County sales tax revenues. Each Bid shall be accompanied by a separate envelope containing a Bidder's bond in a sum equal to five percent (5%) of the full amount of the Bid, executed by the Bidder as principal and by a surety company authorized to do business in this state, conditioned that if the principal's Bid be accepted and the contract awarded to them, within ten (10) days after notice of award Bidder will execute and effect a contract in accordance with the terms of the Bid and a contractor's bond as required by law and the regulations and determinations of the governing board. Each bid shall include an acknowledgement of receipt of Addenda. Such acknowledgement shall be on the form provided in the Instructions to Bidders and shall be included in the separate envelope with the Bid Bond and North Dakota Contractor's License or acknowledge receipt of Addenda on the outside of the Bid envelope All Bidders should be advised that if awarded, the Contractor shall comply with the (i) American Iron and Steel requirements; (ii) Civil Rights requirements; (iii) Equal Employment Opportunity requirements; (iv) create an affirmative action plan; (v) provide evidenced of compliance with the Disadvantaged Business Enterprises (DBE) participation; (vi) and provide evidence of compliance with the Davis Bacon Act as more fully set forth in the draft Contract. Each bid shall be accompanied, in the same envelope, by bidder's completed (i) MBE/WBE Subcontractor Solicitation Information form; (ii) Certification regarding Debarment, Suspension, and other Responsibilities form; (iii) DBE Subcontractor Utilization form, and (iv) DBE Subcontractor Performance form. In compliance with Section 43-07-12 of the North Dakota Century Code, each contractor submitting a bid must have a copy of Bidder's North Dakota Contractor's License or certificate of renewal thereof, issued by the North Dakota Secretary of State and enclosed in the separate bid bond envelope; must be licensed for the highest amount of Bidder's total bid combination; and such license must have been in effect at least ten (10) days prior to the date of the bid opening. No bid will be read or considered which does not fully comply with the provisions herein as to bonds and licenses, MBE/WBE form, Disbarment form, DBE forms, and acknowledgment of Addenda. Any deficient bid submitted will be resealed and returned to bidder immediately. Bid security shall be made payable to the Owner. Bid securities of the two lowest Bidders will be retained until Contract has been awarded and executed, but not longer than 30 days. The Owner reserves the right to reject any or all Bids and to waive informalities therein. Bids Open 02/29/2024 at 1:00 PM CT Bids received will be publicly opened and read via live video conference which can be accessed at this link: https://urldefense.com/v3/__https://teams.microsoft.com/l/meetup-join/19*3ameeting_YTJlYjJiMDAtYzg1Ni00N2ExLWFlNzAtN2JkNzllNzc2NWMw*40thread.v2/0context=*7b*22Tid*22*3a*2284331ac0-3b14-458a-bc9d-f0208a38a747*22*2c*22Oid*22*3a*22270766cd-88c2-4f3c-8f06-019f32391313*22*7d__;JSUlJSUlJSUlJSUlJSUl!!B5cixuoO7ltTeg!DGKIHp5cSPzVs1TZKb65Z4bDpVLP1gH4p2wpm8dLobR7LoI_aAGpfwlPxywn2UwJRV1Sd5epL93EMUM37yY$ OR via telephone at: +1 323-457-5870, 575528933# United States, Los Angeles (Toll) Conference ID: 575 528 933# Question Deadline 02/23/2024 Bidder's Request for Information (RFI) about the meaning or intent of the Bidding Documents are to be submitted to Owner's Representative via the Issuing Office (Aconex). Access Date: Contractor Access immediately following NTP. Milestone 1 - Partial Substantial Completion June 28, 2024 Partial Substantial Completion for exploratory excavation, Milestone 1. Start Date – May 27, 2024 Substantial Completion by – August 30, 2024 Final Completion by – September 27, 2024. March 28, 2024 - Scheduled Diversion Authority Board meeting

Award

Water / Sewer

$1,749,848.00

Public - City

Site Work

30

11

4

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
11
Bidding Soon
118
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

May 31, 2024

img_map_placeholder

Multiple Locations, West Fargo, ND

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.