Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2025 at 8:00 PM
Updated September 18, 2025
Site work for a civil project in Sunnyside, Washington. Conceptual plans call for site work for a water / sewer project.
As of March 28, 2025, this project is in the design phase. Construction will not begin for 3-5 years. Design - WW6 Re-Regulation Reservoir Enlargement. The District Envisions the Feasibility Study Being Completed in Two Basic Phases. Phase I Will Bring Forth an in Depth Preliminary (Approximately 30%) Design for All Aspects of the Reservoir, Reservoir Embankment, Penstock, Pumping Plant, Power Transmission Lines, Scada Integration, Main Canal Pipeline and Any Other Aspect Required for Completion of This Project. Known Requirements for the Finished Reservoir: o Estimated 600 to 900 Acre-ft Storage Capacity. o Required Pumping Capacity of 75 Cfs. o Required Return Capacity of 100 Cfs. At This Point Pros and Cons for Project Alternatives Not Already Determined, Will Be Addressed. Phase Ii Will Bring Design to Approximately 60%. During This Phase All Washington State Safety of Dams Requirements, an Environmental Report to Satisfy Nepa Requirements, and a Final Determination of the Amount of Water to Be Saved as a Result of Building and Implementing This Reservoir Will Be Addressed. The Feasibility Study Will Be Conducted by the Chosen Engineering Consulting Firm With Help From and Overall Project Supervision by the Roza Irrigation District Engineer.
Conceptual
Water / Sewer
$230,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2028
Multiple Locations, Sunnyside, WA
Related To This Project
Sunnyside, WA
Bid Date: Mar 21 2024
Sunnyside, WA
Bid Date: Apr 17 2024
Sunnyside, WA
Bid Date: Apr 04 2024
Sunnyside, WA
--
Sunnyside, WA
--
Sunnyside, WA
Bid Date: May 02 2024
Sunnyside, WA
Bid Date: Aug 28 2024
Sunnyside, WA
Bid Date: May 30 2024
Sunnyside, WA
Bid Date: May 07 2019
Sunnyside, WA
Bid Date: Jan 28 2021
Sunnyside, WA
Bid Date: Mar 21 2024
Sunnyside, WA
Bid Date: Dec 07 2023
Sunnyside, WA
Bid Date: Dec 07 2023
Sunnyside, WA
Bid Date: Dec 20 2023
Sunnyside, WA
Bid Date: Sep 29 2023
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
