BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2024 at 8:00 PM

Updated April 11, 2024

Site work for a civil project in Franklin Township, Missouri. Completed plans call for site work for a bridge / tunnel; water / sewer project; and road / highway.

The proposed work includes the removal and replacement of 10 culverts crossing Midway Road in Miller County, MO. All replacement culverts are to be Gray HP Storm pipe, double walled with smooth interior. The project includes 450 LF of 18" Gray HP Storm Pipe, 42' of 24" Gray HP Storm Pipe, and 46' of 30" Gray HP Storm Pipe placement. All questions concerning this project during the bidding process shall be forwarded to the project contact listed below: For plans & specifications: Aaron McVicker, P.E. McClure 107 Butler Street Macon, MO 63552 Phone: 660-415-4007 amcvicker@mcclurevision.com Responsible persons for County in charge of work: Don Abbett Presiding Commissioner 2001 Hwy 52 Tuscumbia, MO 65082 Phone: 573-369-1900 Fax: 573-369-1905 bdaniels@millercountymo.org A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The Owner, however, reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in his interest. Only if Bids Exceed $75,000 will minimum wage rates for this contract be prevailing wage rates as determined by the Industrial Commission of Missouri. The wage rates are set forth in the contract documents, and are to be considered as a part of this Invitation to Bid. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The contract, if awarded, will be awarded to the lowest, responsive, responsible bidder complying with the Conditions of the Contract Documents within the Owner's budget.

Award

Bridges / Tunnels

$71,336.00

Public - County

Site Work

3

10

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
72
Bidding Soon
591
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

April 5, 2024

Project location map

Midway Rd, Franklin Township, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.