Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Kirkwood, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of March 12, 2024, this project has not yet been awarded. The project is expected to be awarded sometime in April 1st.** The Kirkwood School District R-7 is seeking qualified bids for the KSD (2024) Pavement Improvement Projects. This project requires the Contractor to provide Full Depth Reclamation of asphalt parking lots and drives. This includes but is not limited to, the pulverizing (reclaiming) of existing flexible pavement, base and/or subgrade soil to the length, depth, and width as specified or as shown on the plans, blending with a cementitious stabilizer (Portland cement), water and other additives (cement, lime, lime kiln dust, fly ash or corrective aggregate) as required by the mix design, to produce a cementitious stabilized base. This material shall then be shaped, compacted, cured, and protected in accordance with the plans and specs. This project also includes the installation of fencing, including gates and hardware, concrete curbing, and parking lot striping. All bids equal to or greater than $5,000 must be accompanied by a Bidder's Bond executed by the Bidder as Principal and by a Surety Company authorized to do business in Missouri as the Surety; or a company check in a sum equal to five percent (5%) of the total amount of the Bid. The Owner reserves the right to hold all bids for a period of sixty (60) days after the date fixed for the openings of bids, to reject any and all Bids and waive any formalities or irregularities. Questions should be directed to the Facilities Department, 314-213-6100 Ext 8506: Jeremy Gleiforst, Warehouse & Grounds Manager Jeremy.gleiforst@kirkwoodschools.org The Contractor will be allowed to start on-site work (except as noted below) no earlier than June 10th, 2024 and the work must be completed no later than August 3rd, 2024. Bid documents will be available from the Owner beginning on February 20 th , 2024. Qualified bidders and subbidders are encouraged to obtain documents at least 24 hours prior to the scheduled NON-MANDATORY pre-bid meeting. Documents will not be available at the pre-bid meeting. Call the Facilities Office at 314-213-6185 to obtain bid documents or visit https://www.kirkwoodschools.org/Domain/80 SYSTEM DESCRIPTION A. Provide concrete paving according to materials, workmanship, and other applicable requirements of standard specifications in accordance with the Authority Having Jurisdiction. B. All sidewalks and curb ramps within the City of Kirkwood and St. Louis County right-ofway or easement shall be constructed in accordance with AHJ specifications and the current approved American with Disabilities Act (ADA) Accessibility Guidelines. C. All curb ramps shall be installed with detectable warning surface (truncated domes) across the full width of the ramp. Color shall be red unless otherwise required by AHJ. Questions should be directed to the Facilities Department, 314-213-6100 Ext 8506: Jeremy Gleiforst, Warehouse & Grounds Manager Jeremy.gleiforst@kirkwoodschools.org
Bid Results
Roads / Highways
$309,198.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2024
June 10, 2024
Multiple Locations, Kirkwood, MO
Related To This Project
Kirkwood, MO
Bid Date: Mar 08 2024
Kirkwood, MO
Bid Date: Mar 21 2024
Kirkwood, MO
Bid Date: Mar 14 2024
Kirkwood, MO
Bid Date: Mar 15 2024
Kirkwood, MO
Bid Date: Mar 20 2024
Kirkwood, MO
Bid Date: Mar 11 2024
Kirkwood, MO
Bid Date: Apr 17 2024
Kirkwood, MO
Bid Date: Feb 29 2024
Kirkwood, MO
Bid Date: Feb 23 2024
Kirkwood, MO
Bid Date: Feb 27 2024
Kirkwood, MO
Bid Date: Mar 19 2024
Kirkwood, MO
--
Kirkwood, MO
Bid Date: Feb 15 2024
Kirkwood, MO
Bid Date: Apr 23 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.