Site work and paving for a civil project in Gunnison, Colorado. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Reference Number 0000346299 Job Location: Gunnison, Colorado The Work is located within the City of Gunnison and extends from the intersection of W. Rio Grande Avenue and S. Wisconsin Street to 210 feet east of the intersection of E. San Juan Avenue and S. Main Street. All work will be in City of Gunnison right-of-way. Work to be performed under this Contract includes, but is not limited to, constructing a 21-inch gravity sewer main with associated connections including, but not limited to, manholes, drop-manholes, piping installed by open-cut methods, and all other Work required in accordance with the Contract Documents. Work includes but is not limited to, removal and replacement of asphalt pavement and concrete gutters, offsite disposal, and traffic control. Work includes replacement of irrigation pipelines that will be crossed during sewer line construction. The condition of existing irrigation lines will be evaluated when excavated during construction of the sewer line. Owner reserves the right to reduce the amount of irrigation piping to be replaced if sections are found to be in good condition. This is a rebid of City of Gunnison 2024 Sewer Expansion 21-09 RFB. The project was rebid due to issues with the electronic submission process. The project remains the same as the previous project except for bid submission due date and question due date. Questions submitted on the previous RFB and corresponding questions follow: Q - Please verify which manholes are to lined with corrosion protective liners. The bid form shows a total of (5) manholes to be lined and the plan set shows MHs #6, #8, #10, #12. A - Per specification 09 96 01, Part 2.1, C - Corrosion Protection: All drop manholes and connections to the interceptor sewer shall be coated on the interior surface. The missing rim elevation at PROP MH7A should be: 7690.96. No changes to quantities or scope. This detail will be added to the construction drawing set after bid award. The quantity of 5 as listed on the bid form is correct. Manholes to be lined include MHs 6, 7A, 8, 10 and 12. The Work is located within the City of Gunnison and extends from the intersection of W. Rio Grande Avenue and S. Wisconsin Street to 210 feet east of the intersection of E. San Juan Avenue and S. Main Street. All work will be in City of Gunnison right-of-way. Work to be performed under this Contract includes, but is not limited to, constructing a 21-inch gravity sewer main with associated connections including, but not limited to, manholes, drop-manholes, piping installed by open-cut methods, and all other Work required in accordance with the Contract Documents. Work includes but is not limited to, removal and replacement of asphalt pavement and concrete gutters, offsite disposal, and traffic control. Work includes replacement of irrigation pipelines that will be crossed during sewer line construction. The condition of existing irrigation lines will be evaluated when excavated during construction of the sewer line. Owner reserves the right to reduce the amount of irrigation piping to be replaced if sections are found to be in good condition. Please refer to RFB documents for details. Question Deadline 03/21/2024 at 5:00 PM MT Email all questions to the City Clerk at cityclerk@gunnisonco.gov The Project has a required Substantial Completion date of October 11, 2024, with an expected Notice of Award on April 10, 2024.

Bid Results

Water / Sewer

$1,256,100.00

Public - City

Paving, Site Work

18

23

4

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
84
All Active Projects
35
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2024

April 25, 2024

img_map_placeholder

Multiple Locations, Gunnison, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.