Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Remodeling of a library in Byron, Illinois. Completed plans call for the remodel of a library.
Library Resource Center remodel at Byron High School All bids must be accompanied by a Bid Security in the form of Bid Bond in the amount of 10% of the Base Bid (plus additive alternates) made payable to the Owner. The successful bidder will be required to fumish a Performance and Payment Bond in the full amount of the Contract executed on ALA. Form A-312, "Performance Bond and labor and Material Payment Bond" prior to the start of any work. The Performance Bond shall: 1) serve as security for faithful performance of the work; and 2) guarantee the work against defective workmanship and material for a period of not less than one (1) year following acceptance of the work The Labor and Material Bond shall serve as security that all wages are paid and materials provided for the work are paid by the successful Bidder. For contract awards that are less than $50,000,00, a Letter of Credit, in a form suitable to the Owner, may be submitted as performance security, instead of a Performance Bond and a Labor and Material Payment Bond. The Surety is to be approved by the Owner. The Contractor will pay for the cost of all Bonds. All Bids shall include cost of performance and payment bond The Contractor shall pay, if applicable, not less than the prevailing rate of wages as established, to all laborers, workmen and mechanics in the performance of Work under this Contract in accordance with "An Act regulating wages of laborers, mechanics and other employed under contracts of Public Works." 820 ILCS 130/1 et seq. Each Prime Contractor is required to perform their work within the following Preliminary Construction Schedule. The Construction Manager anticipates an aggressive construction operation. By submitting a bid cach Contractor guarantees they can meet the proposed Construction Schedule. If a Contractor is determined to be impeding the progress of the overall Project Schedule, the work delaying such progress will be passed over in the normal course of business, and the Contractor impeding the progress shall be responsible for installing the work under another means and paying for any additional cost, or damages resulting from such action. The Contractor shall assume multiple mobilizations may be required to perform their scope of work. All Bids shall include costs for the same. Substantial Completion Time Schedule: 1. Project Commencement: May 28, 2024 2. Substantial Completion: August 9, 2024 The Owner reserves the right to reject any and all bids, to waive any informality in bidding, or accept the bid that, in his opinion, will serve his best interests.
Award
Library
$1,232,700.00
Public - City
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 29, 2024
May 28, 2024
696 N Colfax St, Byron, IL
Related To This Project
Byron, IL
Bid Date: Mar 15 2024
Byron, IL
Bid Date: Oct 17 2024
Byron, IL
Bid Date: May 16 2024
Byron, IL
Bid Date: Jun 21 2024
Byron, IL
Bid Date: Jul 18 2024
Byron, IL
Bid Date: Oct 02 2024
Byron, IL
Bid Date: Oct 17 2024
Byron, IL
Bid Date: Feb 28 2024
Byron, IL
Bid Date: Feb 28 2024
Byron, IL
Bid Date: Feb 01 2024
Byron, IL
Bid Date: Feb 23 2024
Byron, IL
Bid Date: Aug 31 2022
Byron, IL
Bid Date: Jan 24 2022
Byron, IL
Bid Date: Mar 10 2022
Byron, IL
Bid Date: Mar 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.