Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Beaufort, South Carolina. Working plans call for site work for a road / highway; and for paving for a road / highway.
As of 11/5/2024, no bids were received. It is the intent of Beaufort County to solicit competitive sealed proposals from qualified proposers with the ability and capacity to perform the scope of work as outlined in this solicitation. Scope of Work o All work and materials shall meet all applicable County and SCDOT standards. o All material certifications and submittals shall be submitted prior to work commencing. o Provide Traffic Control per SCDOT Standard Drawings, specifications, and MUTCD throughout ALL activities. o Restore and/or replace shoulder or berms where necessary due to construction operations. Provide topsoil and seed at areas to restore shoulders flush to pavement or sidewalk. Shoulder restoration and berm restoration not shown in the plans is considered incidental and has not been included in bid quantities. o Mill asphalt pavement as required for transitions and tie-ins to all concrete curb/gutter, islands etc. and butt joints to existing asphalt. Milling for tie-ins and joints is considered incidental and has not been included in bid quantities. o Time between milling roadway and asphalt application will not exceed 5 calendar days. o 6" Full Depth Patching (FDP), SCDOT intermediate C- Bid quantities include an estimated 100 SY around utility manholes and valves for the full depth patch quantity. o Allowances are established for the Owners benefit. Contractor will be paid only for materials actually used for allowance items. o It is the responsibility of the contractor, in the presence of the County's representative, to mark all full depth patch locations. The County's representative shall be present to review and verify field marked full depth patch areas All questions must be submitted through the Procurement Portal no later than 5:00 pm on Tuesday, October 22, 2024.
Final Planning
Roads / Highways
$457,912.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2024
May 5, 2025
Goethe Hill Rd, Beaufort, SC
Related To This Project
Beaufort, SC
Bid Date: May 02 2019
Beaufort, SC
Bid Date: May 11 2021
Beaufort, SC
Bid Date: Mar 10 2021
Beaufort, SC
Bid Date: Mar 21 2024
Beaufort, SC
Bid Date: Mar 26 2024
Beaufort, SC
Bid Date: Mar 27 2024
Beaufort, SC
Bid Date: Apr 09 2024
Beaufort, SC
Bid Date: Mar 20 2024
Beaufort, SC
--
Beaufort, SC
Bid Date: Jan 29 2024
Beaufort, SC
Bid Date: Mar 14 2024
Beaufort, SC
Bid Date: Dec 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.