Site work, paving, outdoor lighting and renovation of a mixed-use development in Paullina, Iowa. Completed plans call for the renovation of a educational facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.
a. Practice Football Field Relocation (Base Bid A) b. Football Field Parking Lot/Lighting (Alternate C1- if accepted) c. South JH/HS Parking Lot reconstruction (Base Bid A) d. JH/HS Existing Locker Room Area Renovations including ADSuiteandCorridor164 (Base Bid A) e. JH/HS Concessions (Base Bid A) - June 1 thru August 23, 2024 f. JH/HS Existing Gymnasium Ceiling Replacement (Alternate A2 - if accepted) - June 1 thru August 23, 2024 g. Complete work in Corridor 164 (Base Bid A) - June 1 thru August 23, 2024h. District Administration Building Parking/Site Improvements (Base Bid A) 2. Phase 2 - Start: around June 1, 2024. Substantial Completion: by August 23, 2025a. JH/HS West Addition including associated parking and site improvements (Base Bid A) b. JH/HS Corridor Ceiling Replacement (Base Bid A) - July 1 thru August 23, 20251. Owner abatement of ceiling finishes - June 1 - 30, 2025. c. JH/HS Interior Door Replacement (Alternate A1) - June 1 thru August 23, 2025d. Old Main Office Renovations (Base Bid A) - July 1 thru August 23, 2025-- Owner moves out of existing Industrial Arts and Main Office spaces Owner moves out of existing building to be demolished - (June 1 - June 30, 2025) e. Canopy resurfacing and shelter metal replacement (Alternate A3) - June 1, 2025 thru August 18, 2025 3. Phase 3 - Start: around July 1, 2025. Substantial Completion: January 30, 2026a. District Administration Building (existing Industrial Arts) renovations (Base Bid B)-- Owner establishes temporary science in MS and move out of old building - (June 1 - July 1, 2025) 4. Phase 4 - Start: around July 1, 2025. Substantial Completion: May 28, 2027a. Old Building Demolition (Base Bid A) July 1, 2025- November 2025b. Science Addition (Base Bid A) - November 2025 - December 2026-- Owner moves into new Science Addition -- -- Possible Construction Break - c. Tensioned fabric shade structure (Alternate A3) - April/May 2025 thru August 18, 2025 d. Old Boiler Room Demolition (Base Bid A) - March 2027 - May 2027e. Science Addition Site Improvements (Base Bid A) - March 2027 - May 2027 Bid Bond to be executed by corporation authorized to contract as a surety in the State of Iowa, in the amount equal to five percent (5%) of the amount of the Bid, The successful Bidder will be required to furnish a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the Contract Sum, issued by a responsible Surety approved by the District and shall guarantee the faithful performance of the Contract and terms and conditions there in contained and the maintenance of said improvements pursuant to the provisions of the Contract Document. Bid Security shall be made payable to South O'Brien Community School District, Paullina, IA Additionally, any sub-contractors with contracts valued over $300,000 shall be required to furnish a Performance Bond and a Labor and Material Payment Bond in the amount of one hundred percent (100%)of the bid (base bid and accepted alternates), payable to the General Contractor. The South O'Brien Community School District, reserves the right to reject any or all bids, re-advertise for new bids, and to waive informalities that may be in the best interest of the South O'Brien Community School District 1. Phase 1 - Substantial Completion: August 23, 2024 2. Phase 2 - Substantial Completion: July 25, 2025 3. Phase 3 - Substantial Completion: January 30, 2026 4. Phase 4 - Substantial Completion: May 28, 2027 The Owner reserves the right to accept or reject any or all offers. Last Request for Information Due: 7 days prior to due date of bids.
Post-Bid
Educational
$850,000.00
Public - City
Outdoor Lighting, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2024
April 15, 2024
216 S Rutledge St, Paullina, IA
Related To This Project
Paullina, IA
Bid Date: May 01 2024
Paullina, IA
Bid Date: Jul 30 2024
Paullina, IA
Bid Date: Dec 06 2024
Paullina, IA
Bid Date: Jan 11 2024
Paullina, IA
Bid Date: Dec 02 2021
Paullina, IA
Bid Date: Apr 18 2023
Paullina, IA
Bid Date: Apr 11 2023
Paullina, IA
Bid Date: Mar 10 2023
Paullina, IA
Bid Date: May 12 2022
Paullina, IA
Bid Date: Oct 18 2022
Griswold, IA
Bid Date: Mar 19 2024
Hiawatha, IA
Bid Date: Mar 19 2024
Kensett, IA
Bid Date: Mar 19 2024
Bremer, IA
Bid Date: Mar 19 2024
Council Bluffs, IA
Bid Date: Mar 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.