BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2024 at 8:00 PM

Updated September 12, 2024

Site work and paving for a mixed-use development in Warren, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of April 30 , 2024, this project was awarded. Reference Number 0000343638 Question Deadline 03/01/2024 at 12:00 PM ET Questions are submitted online Yes 0.26 Miles of concrete removal and replacement along with storm drainage replacement ,drainage replacement, sidewalk & curb ramp reconstruction, driveway reconstruction, and other misc. items of work. Also, 840 feet of 8" fusible PVC C900 Water Main & appurtenances. General Requirements - Bid Deposit Required - Certified Payroll - Installation Required - Insurance Required - Local Service Required - Material Safety Data Sheets Required - Onsite Maintenance Required - Prevailing Wage Required - Safety Standards Plan - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 0.01 % - Labor and Materials Bond 100 % - Payment Bond 100 % -- Each bid must be accompanied by a five percent (5%) Bid Bond or Certified Check as security for acceptance of the Contract. A pdf version of this bid bond or certified check must be included in the bid. The original bid bond or check must be submitted prior to recommendation for award of bid. *The City reserves the right to reject any or all bids and to waive any irregularities in bidding. The City also reserves the right to select multiple bids to fulfill the requirements of this project. No bid may be withdrawn after the scheduled closing time for receiving bids for at least sixty (60) days. The scope of work includes: 0.26 miles of concrete pavement removal and the replacement thereof with non reinf concrete pavement with integral curb on aggregate subbase along with storm drainage replacement, sidewalk and curb ramp reconstruction, driveway reconstruction, and other miscellaneous related items of work. The project also includes 840 feet of 8 fusable PVC C900 water main and appurtenances. The work under this Contract shall consist of the items contained in the Pricing Sheet, including all incidentals necessary to fully complete the project in accordance with the contract Documents. The bidder agrees to commence work under this contract on or before the date to be specified in the “Notice to Proceed” issued by the City and to fully complete the entire project within 110 calendar days and shall have the Project ready for final payment on or before September 20, 2024. The Bidder further agrees to pay as liquidated damages the sum of $ 1,500.00 for each consecutive calendar day the project is not completed as provided in Section 242 of the General Conditions.

Award

Roads / Highways

$1,336,656.00

Public - City

Paving, Site Work

32

11

34

5

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
9
Bidding Soon
2,005
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

April 5, 2024

Project location map

Multiple Locations, Warren, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.