BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Chesapeake, Virginia. Completed plans call for the construction of a 138,000-square-foot educational facility; and for site work for a educational facility.

https://www.pilotonline.com/2024/05/01/chesapeake-infrastructure-projects-will-cost-millions-more-due-to-inflation-city-officials-say/ And a new nearly $56 million elementary school at the Culpepper Landing site is now estimated at $71.3 million. ______________________________________________________ Chesapeake Public Schools (CPS or the Owner) is soliciting Statements of Qualifications (SOQ) from Construction Managers (CM) interested in providing pre-construction and construction services for CPS Capital Project (the "Project"), which consists of a new elementary school in the Culpepper Landing area of Chesapeake, using the Construction Manager (CM) method of project delivery. RRMM has been selected as the architect for this project. Included in the pre-construction scope of services is collaboration with the design professionals during the design phase, attendance of design coordination meetings, constructability reviews, value engineering guidance, construction scheduling, development and negotiation of a guaranteed maximum price (GMP) proposal for construction services with the Owner. If GMP negotiations are successful, CPS will amend the contract to include the GMP. Question Submission Deadline: March 11, 2024, 2:00pm Chesapeake Public Schools (CPS or the Owner) is soliciting Statements of Qualifications (SOQ) from Construction Managers (CM) interested in providing pre-construction and construction services for CPS Capital Project (the "Project"), which consists of a new elementary school in the Culpepper Landing area of Chesapeake, using the Construction Manager (CM) method of project delivery. RRMM has been selected as the architect for this project. Included in the pre-construction scope of services is collaboration with the design professionals during the design phase, attendance of design coordination meetings, constructability reviews, value engineering guidance, construction scheduling, development and negotiation of a guaranteed maximum price (GMP) proposal for construction services with the Owner. If GMP negotiations are successful, CPS will amend the contract to include the GMP. PROJECT DESCRIPTION: The Project consists of Pre-Construction and Construction services for building a new 940-student elementary school. The Project is located in the City of Chesapeake, in the Culpepper Landing neighborhood, on a 24-acre Site currently owned by Chesapeake Public Schools. The Site is former farmland located at the northeast edge of the Great Dismal Swamp National Wildlife Refuge. The Site contains wetlands which will be minimally disturbed. Geotechnical information indicates the Site will require surcharge of fill to stabilize the building area. The building will be approximately 138,000 sf. This project is the next in a series of CPS facilities designed and built to support next-generation, active and differentiated learning. A full package of Owner Project Requirements (OPR), all site information and project concept will be issued with the upcoming RFP. The construction budget for the Project has been set at $55,000,000. The Owner's total Project budget will not exceed the anticipated appropriation, and includes all services needed for the construction of the project. The Owner anticipates that pre-construction services will be required from the CM in the 2nd, 3rd and 4th quarter of 2024. The Owner anticipates construction activities to begin as soon as possible for Final Completion of the Project by May of 2027 or sooner. Major milestones for the Project are as follows: May 21, 2024, Award Contract to Construction Manager August 12, 2024, Begin Early Site Package Work March 31, 2025 Begin Main Site and Building Work May 24, 2027, Final Completion of All Building and Site Work CPS expects the Project Schedule to be collaboratively fine-tuned by the successful CM, CPS and Design Team.

Post-Bid

Educational

$55,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
38
Bidding Soon
608
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

March 31, 2025

img_map_placeholder

To Be Determined, Chesapeake, VA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.