Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in El Centro, California. Contact the soliciting agency for additional information.
Water and Sewer Master Plans and Cost of Service Rates Study. Pre-Bid Meeting No. Online Q&A Yes Q&A Deadline 03/08/2024 4:00 PM (PST) The Consultant shall be responsible for managing the performance of the contract, which includes but is not limited to identifying and the providing adequate staffing to organize and attend a minimum of two monthly progress meeting for the duration of the project, as well as provide budget status reports for monthly invoicing. Additionally, the Consultant shall incorporate attendance at two City Council meetings (dates to be determined). The first meeting shall consist of presenting the draft WMP as an update to the City Council, and the second meeting will consist of a presentation describing the water rate study (based on the draft WMP) that City Council will consider for adoption. The Consultant also will attend internal staff meetings in addition to monthly progress meetings. The overall goal of these Master Plan Updates is to evaluate the existing system for capacity, identify existing and future capacity deficiencies in the system as a result of future developments through build-out of the city, and recommend upgrades and/or expansions to the plants in a prioritized manner to account for growth, operations and maintenance. The City of El Centro is requesting proposals from qualified engineering firms to provide professional services to update the 2008 Sewer Master Plan and the 2008 Water Master Plan for the City of El Centro (collectively the "Master Plan Updates)". At the conclusion of the Master Plan Updates, a prioritized (short term, midterm, long term) Capital Improvement Program (CIP) plan with detailed descriptions shall be prepared based on the findings), along with a comprehensive cost of service and capacity fees analysis. Additional information is provided in this RFP along with the required tasks for each plan and the rate study. Consultant may submit proposals that includes any additional task they believe should be part of the scope. The City may select the top firm to develop the study. The City of El Centro reserves the right to reject any and all proposals submitted and/or request additional information for clarification. The Consultant shall submit four (4) bound and one (1) unbound draft of the cost of service rate study for review prior to submittal of the final study. The City shall review and respond with comments within four weeks of receiving the draft study. The City will then host a meeting between both project teams to discuss all comments upon completion of the City's review. Event RFP description: The Consultant shall prepare and submit five (5) copies of the final cost of service rate study, along with one fully editable digital copy. All deliverables shall be submitted on a flash or other USB storage device. Task S8 Deliverables: Two (2) hard copies and the Word files of a draft Sewer Master Plan. Deliver sewer hydraulic model and all supporting electronic documents for the hydraulic model and finalized report in a digital format acceptable to City GIS Technician. Deliver three (3) hard copies and one (1) PDF electronic copy of the report. Three (3) hard copies each of the existing and buildout Master Plant of Sewer exhibits and the electronic files.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2024
To Be Determined, El Centro, CA
Related To This Project
El Centro, CA
Bid Date: Apr 04 2024
El Centro, CA
Bid Date: Mar 28 2024
El Centro, CA
Bid Date: Apr 15 2024
El Centro, CA
Bid Date: Apr 06 2021
El Centro, CA
Bid Date: May 01 2024
El Centro, CA
Bid Date: Apr 24 2024
El Centro, CA
Bid Date: Feb 26 2021
El Centro, CA
Bid Date: May 15 2024
El Centro, CA
Bid Date: Mar 21 2024
El Centro, CA
Bid Date: Mar 01 2024
El Centro, CA
Bid Date: Jan 24 2024
El Centro, CA
Bid Date: Mar 01 2024
El Centro, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.