BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and paving for a mixed-use development in Monticello, Illinois. Completed plans call for the demolition of a road / highway; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

Monticello Community Unit School District #25 is accepting bids from contractors for work at Monticello High School in Monticello, Illinois. The scope of work includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary for completion of the work indicated in the Bid Documents including, but not necessarily limited to, the following: demolition, earthwork, concrete pavement flat work, striping, fencing, parking lot signage, wheel stops, and landscape restoration associated with the Pavement Improvements for Monticello CUSD #25 Project. Question Deadline 03/04/2024 at 2:00 PM CT The bid documents will be reviewed, bidders' questions will be answered, and contract requirements will be reviewed. Contact Spencer Craig (Eriksson Engineering) at scraig@eea-ltd.com or 847-254-6702 with any questions related to the bidding documents and or the pre-bid meeting. Each bid must be accompanied by a bid security in the amount of ten percent (10%) of the Base Bid. The successful Bidder will be required to furnish construction performance and payment bonds in the full amount of the Contract Sum. The Contractor shall not pay less than the prevailing rates for all work performed under this contract and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1 et seq). The Contractor must be required to submit electronic copies of their certified payrolls to the Engineer with each application for payment. Community Unit School District #25 reserves the right to accept or reject any or all bids, reject nonconforming bids, reject conditional bids, waive irregularities in the bidding procedures, or to accept any bid that, in its sole opinion, best serves the interests of the School District. On-site construction is scheduled to commence May 28, 2024. Substantial Completion Date: July 26, 2024. Final Completion Date: August 9, 2024.

Post-Bid

Roads / Highways

$400,000.00

Public - State/Provincial

Demolition, Paving, Site Work

8

11

8

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
74
Bidding Soon
787
All Active Projects
359
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 12, 2024

May 28, 2024

August 9, 2024

img_map_placeholder

1 SAGE DRIVE, ,, Monticello, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.