BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2024 at 8:00 PM

Updated July 31, 2024

Site work and paving for a mixed-use development in Monticello, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

City/County - Monticello HMA resurfacing, cold milling, pavement patching, curb and gutter removal and replacement and ADA sidewalk ramps. HMA binder & surface (2,005 tons); HMA surface removal (12,381 square yards); combination concrete curb & gutter (527 lineal feet); PC concrete sidewalk (828 square feet); pavement patching (43 square yards); manhole and inlet adjustments (20 each); thermoplastic pavement marking line (1,255 feet); seeding & mulch (0.10 acre). Project Location: Grant Street and Buchanan Street in the City of Monticello. Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - HMA Resurfacing, Cold Milling, Pavement Patching, Curb and Gutter Removal and Replacement and Ada Sidewalk Ramps. HMA Binder & Surface, HMA Surface Removal

Award

Roads / Highways

$726,948.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
48
Bidding Soon
913
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

August 16, 2024

Project location map

E Grant St & N Buchanan St, Monticello, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.