BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2024 at 8:00 PM

Updated June 4, 2024

This is a service / maintenance or supply contract in Avenal, California. Contact the soliciting agency for additional information.

Rebid 1-Water Tank Exchange System Maintenance and Repair Services Description: This is an Agreement in which the Contractor shall perform Water Tank Exchange System Maintenance and Repair Services for Avenal State Prison. The Contractor shall be compensated for services in accordance with the service rates specified in Exhibit B-1, Rate Sheet; which shall include all parts, labor, materials, supplies, tools, equipment, permits and licenses, transportation and every other item of expense necessary to provide Water Tank Exchange System Maintenance and Repair Services for the California Department of Corrections and Rehabilitation (CDCR) for the Co-generation Plant reverse osmosis (RO) / de-mineralized (DI) / water softening systems, water system at Avenal State Prison, located at #1 Kings Way, Avenal, CA 92304. The State is not required to award an Agreement and reserves the right to reject any and all bids and to waive any immaterial deviations in the bid. The State’s waiver of an immaterial deviation shall in no way modify the IFB document or excuse the bidder from full compliance with all requirements if awarded the Agreement. The Director of the Department of Industrial Relations (DIR) has ascertained general prevailing wage rates in the county in which the work is to be performed. Upon request, the State shall furnish to the Contractor a copy of such prevailing wage rates that the Contractor shall post at the job site. The Contractor must possess a valid C-36 or C-55 California Contractors State License Board specialty license or a “B” license with a subcontractor who possesses the required specialty license.The Contractor shall be an individual or firm licensed to do business in California and shall obtain at Contractor’s expense all license(s) and permit(s) required by law for accomplishing any work required in connection with this Agreement. AGREEMENT EXECUTION The Agreement will be executed only upon the State's acceptance of the Contractor's certificates of insurance, bonds, licenses, and permits, when such items are required. Should the Contractor fail to commence work at the agreed-upon date and time, the State, upon five (5) days written notice to the Contractor, reserves the right to terminate the Agreement.

Post-Bid

Jails / Prisons

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
53
Bidding Soon
659
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

July 1, 2024

Project location map

1 Kings Way, Avenal, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.