BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Sawyer, Michigan. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

Removal of snow fence and relocation of sand on day use beach public use area to provide parking and public access to the beach parking lot and sidewalks per attached scope of work. Work is needed to prepare beach for visitors. If work is not completed the fence and/or sand would impede visitors and could impose a safety hazard. Work to be performed approximately: 4/14-4/27/2024. Service Start : 4/14/2024 Service End : 4/27/2024 Scope of Work for Snow Fence Removal: Remove the snow fence and metal posts from the beach area in a manner that will minimize damage for future use. Roll up the fence. Bring the metal posts up to the beach lots. DNR staff will remove the fencing and posts from each beach lot area. Scope of Work for Sand Relocation: Remove all sand accumulations from between the parking lots, from paved parking lots, behind parking lots number 1 and number 3, from the sidewalks, and from around the beach buildings. The rows of sand should be smoothed out in the direction toward the lake. The rows are not to exceed to the water's edge. Clear the sand from the roadway behind beach lot #1 and beach lot #3. The shoulder area behind each lot should be at least 15' of clearance.

Post-Bid

Playgrounds / Parks / Athletic Fields

$20,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
18
Bidding Soon
1,687
All Active Projects
660
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

April 14, 2024

img_map_placeholder

12032 Red Arrow Hwy, Sawyer, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.