BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Sawyer, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; and road / highway.

2.60 mi of hot mix asphalt cold milling and resurfacing, shared-use path, concrete curb and gutter, guardrail, drainage and pavement markings on Red Arrow Highway from Berrien Street to Lakeshore Drive, Berrien County. This is a Local Agency project Net classification required for this project is 4537 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No TAL 11000 220925A 24A0591 STL 11000 216289A 24A0593 MI DOT - 034 - Hot Mix Asphalt Cold Milling and Resurfacing, Shared-use Path, Concrete Curb and Gutter, Guardrail, Drainage and Pavement Markings on Red Arrow Highway Description. This work consists of removing existing concrete or masonry pavement, regardless of depth, as directed by the Engineer in accordance with section 204 of the Specifications for Construction except as modified herein. This item shall include removing pavement which consists of asphalt over concrete. Payment of asphalt and concrete removal will not be separate. Job no. 22-0061 ITEM NUMBER - 2407 034 Letting Number: 240712

Award

Roads / Highways

$4,078,500.00

Public - State/Provincial

Paving, Site Work

72

7

4

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
18
Bidding Soon
1,687
All Active Projects
660
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2024

September 10, 2024

img_map_placeholder

Red Arrow Hwy, Sawyer, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.