BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2024 at 8:00 PM

Updated May 2, 2024

Site work for a water / sewer project in Red Bay, Alabama. Completed plans call for site work for a water / sewer project.

The Work of Providing Labor, Materials, and Equipment for the Proposed City of Red Bay Sewer Trunk Line Upgrade Project Phase Ii - Contract 2 1. Install Only Approximately 300 Lf of 24" Sdr-26 Gravity Sewer Line. 2. Install Only Approximately 1,900 L.f. Of 18" Sdr-26 Gravity Sewer Line 3. Furnish and Install Eight (8) Manholes 4. Furnish and Install, Maintain Silk Fence for Erosion Control 5. Furnish Needed Materials to Reconnect Existing Sewer Services The Successful Bidder Must Furnish a Performance Bond for One Hundred (100%) of the Bid Amount and a Payment Bond for One Hundred (100%) Percent of the Bid Amount and Must Secure His Bond From a Bonding Company's Representative or Agent in the State of Alabama. No Bid May Be Withdrawn After the Time for Opening Bids Has Passed. Liquidated Damages Will Be Assessed if the Contract Time is Exceeded. The Contractor May Apply for an Extension of Time in Accordance With the Provisions of the Contract; However, Such an Extension Must Be Approved Prior to the Contract Completion Date to Avoid the Imposition of Liquidated Damages. The Contractor is Hereby Advised That Time is of the Essence on This Project and That the Contract Time of 160 Consecutive Calendar Days Total and Noted Restrictions Shall Be Strictly Observed The Owner Reserves the Right to Hold the Bids for a Period of Sixty (60) Days After the Date of Receiving Bids. The Owner Reserves the Right to Reject Any or All Bids, to Waive Any Informality in Any Bid, and to Accept Any Bid Considered Advantageous to the Owner. **Document Notes: No Refunds Will Be Made Except to Prime Contractor Bidders, Which Shall Be Refunded for One Bid Set.

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
28
Bidding Soon
406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 15, 2024

Project location map

To Be Determined, Red Bay, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.