Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Red Bay, Alabama. Completed plans call for site work for a water / sewer project.
The Work of Providing Labor, Materials, and Equipment for the Proposed City of Red Bay Sewer Trunk Line Upgrade Project Phase Ii - Contract 2 1. Install Only Approximately 300 Lf of 24" Sdr-26 Gravity Sewer Line. 2. Install Only Approximately 1,900 L.f. Of 18" Sdr-26 Gravity Sewer Line 3. Furnish and Install Eight (8) Manholes 4. Furnish and Install, Maintain Silk Fence for Erosion Control 5. Furnish Needed Materials to Reconnect Existing Sewer Services The Successful Bidder Must Furnish a Performance Bond for One Hundred (100%) of the Bid Amount and a Payment Bond for One Hundred (100%) Percent of the Bid Amount and Must Secure His Bond From a Bonding Company's Representative or Agent in the State of Alabama. No Bid May Be Withdrawn After the Time for Opening Bids Has Passed. Liquidated Damages Will Be Assessed if the Contract Time is Exceeded. The Contractor May Apply for an Extension of Time in Accordance With the Provisions of the Contract; However, Such an Extension Must Be Approved Prior to the Contract Completion Date to Avoid the Imposition of Liquidated Damages. The Contractor is Hereby Advised That Time is of the Essence on This Project and That the Contract Time of 160 Consecutive Calendar Days Total and Noted Restrictions Shall Be Strictly Observed The Owner Reserves the Right to Hold the Bids for a Period of Sixty (60) Days After the Date of Receiving Bids. The Owner Reserves the Right to Reject Any or All Bids, to Waive Any Informality in Any Bid, and to Accept Any Bid Considered Advantageous to the Owner. **Document Notes: No Refunds Will Be Made Except to Prime Contractor Bidders, Which Shall Be Refunded for One Bid Set.
Post-Bid
Water / Sewer
$700,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2024
April 15, 2024
To Be Determined, Red Bay, AL
Related To This Project
Red Bay, AL
Bid Date: Mar 28 2024
Red Bay, AL
Bid Date: May 16 2024
Red Bay, AL
Bid Date: Jul 18 2024
Red Bay, AL
Bid Date: Aug 30 2024
Red Bay, AL
--
Red Bay, AL
Bid Date: Mar 11 2021
Red Bay, AL
Bid Date: Mar 02 2021
Red Bay, AL
Bid Date: Feb 22 2022
Red Bay, AL
Bid Date: Feb 24 2022
Red Bay, AL
Bid Date: Dec 16 2021
Red Bay, AL
Bid Date: Dec 07 2021
Red Bay, AL
Bid Date: Jul 29 2022
Red Bay, AL
Bid Date: May 19 2022
Red Bay, AL
Bid Date: Feb 11 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.