BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2024 at 8:00 PM

Updated March 18, 2024

Renovation of an educational facility in Columbia, Maryland. Completed plans call for the renovation of a educational facility.

Heating and cooling and air conditioning HVAC construction and maintenance services - The Howard County Board of Education invites your participation in a bid for the conversion of the existing hybrid direct digital control (DDC) / pneumatic control system for the HVAC systems at the 204,000 square foot Oakland Mills High School to full DDC. Phase 1 (summer 2024): a. DDC conversion for the existing airside HVAC systems installed in 1972. b. Air and water balancing for the existing airside HVAC systems installed in 1972. Phase 2 (summer 2025): a. DDC conversion for the remaining HVAC systems. b. Air and water balancing for the remaining HVAC systems. Questions Due Date: Mar 4th 2024, 1:00 PM EST Intent to Bid Due Date Online Portal Deadline to indicate your intent to Bid Mar 14th 2024, 1:00 PM EDT Phase-1- Work to be completed in the summer of 2024 (6/17/2024 to 8/9/2024). Phase-2 (6/16/2025 to 8/8/2025) o The chilled water system shall be shutdown and drained from 6/20/2024 to 7/19/2024. Task 1: Provide a new SNE panel in the Boiler Room. Note that the existing N2 SNE panel shall remain until the end of phase 2. o Task 2: Provide a new trunk line that extends to all 1972 equipment (Total of 9 AHUs). o Task 3: Convert the operation of AHU-5 and AHU-6, from single-zone constant air volume operation to single-zone variable air volume operation with hot water reheat to provide acceptable space relative humidity during cooling operation o Task 4: Convert the operation of AHU-8, from single-zone constant air volume operation to single-zone constant air volume operation with hot water reheat to provide acceptable space relative humidity during cooling operation Task 5: Upgrade the ATC hardware mounted on, or near the remaining 1972 equipment not mentioned in the previous tasks (AHU-1, 2, 6, 7, 9, 10, and 12) Task 6: Replace existing space sensors and provide additional sensors as indicated on the Contract Documents o Task 7: Perform air and water balancing for the airhandling units. o Task 8: Update the sequence of operations as described in the Contract Documents.

Bid Results

Educational

$1,210,500.00

Public - County

Renovation

17

17

19

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
546
Active Projects
206
Bidding Soon
3,469
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

June 17, 2024

Project location map

9410 Kilimanjaro Rd, Columbia, MD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.