Site work for a water / sewer project in Rancho Cordova, California. Completed plans call for site work for a water / sewer project.

***As of March 26, 2024 Bid has been cancelled since The Water Forum will not be selecting a contractor from the two proposals that were submitted for P24804101001. The Water Forum is making revisions to the design, refining costs, adding some optional items, and will have a publish a new RFP package within a few days. Online Q&A Yes Q&A Deadline 03/08/2024 12:00 PM (PST) Submit all questions via the City of Sacramento online bid portal Response Format Electronic The City of Sacramento is soliciting proposals to construct in-river salmonid habitat enhancements at the River Bend site in the Lower American River for the Water Forum. Since 2008, the City of Sacramento/Water Forum has partnered with the U.S. Bureau of Reclamation and others to plan, design, permit, and construct Federally and State funded salmonid habitat enhancements in the Lower American River (LAR). A. In river work window associated with endangered species protections is restricted to July 1, 2024 to October 31, 2024. In river work window restrictions do not apply to Mississippi Bar Stockpile Area. B. All work at the River Bend Project Area must be performed in 8 weeks and between July 1, 2024 and October 11, 2024, with the exception of site restoration; planting and seeding may extend past this period. An extension of the work window (past October 11, 2024) may be given in the event of delayed permits allowing in-river work. 1. Hauling of excess material to Teichert Aggregates - Perkins Facility shall be restricted to 15 workdays in the period between July 1, 2024 and October 11, 2024. i. Hauling shall be limited to no more than 59 truck trips per day. ii. No hauling may occur on weekends or holidays City departments shall require a five percent (5%) LBE participation level in City procurement opportunities for services or public projects of $250,000 or greater unless a waiver or reduction of the participation level is A. In river work window associated with endangered species protections is restricted to July 1, 2024 to October 31, 2024. In river work window restrictions do not apply to Mississippi Bar Stockpile Area. B. All work at the River Bend Project Area must be performed in 8 weeks and between July 1, 2024 and October 11, 2024, with the exception of site restoration; planting and seeding may extend past this period. An extension of the work window (past October 11, 2024) may be given in the event of delayed permits allowing in-river work. 1. Hauling of excess material to Teichert Aggregates - Perkins Facility shall be restricted to 15 workdays in the period between July 1, 2024 and October 11, 2024. i. Hauling shall be limited to no more than 59 truck trips per day. ii. No hauling may occur on weekends or holidays City departments shall require a five percent (5%) LBE participation level in City procurement opportunities for services or public projects of $250,000 or greater unless a waiver or reduction of the participation level is A. In river work window associated with endangered species protections is restricted to July 1, 2024 to October 31, 2024. In river work window restrictions do not apply to Mississippi Bar Stockpile Area. B. All work at the River Bend Project Area must be performed in 8 weeks and between July 1, 2024 and October 11, 2024, with the exception of site restoration; planting and seeding may extend past this period. An extension of the work window (past October 11, 2024) may be given in the event of delayed permits allowing in-river work. 1. Hauling of excess material to Teichert Aggregates - Perkins Facility shall be restricted to 15 workdays in the period between July 1, 2024 and October 11, 2024. i. Hauling shall be limited to no more than 59 truck trips per day. ii. No hauling may occur on weekends or holidays City departments shall require a five percent (5%) LBE participation level in City procurement opportunities for services or public projects of $250,000 or greater unless a waiver or reduction of the participation level is approved Ongoing construction of new habitat sites and maintenance of previously constructed spawning and rearing habitat in the LAR is integral to supporting the persistence and recovery of steelhead trout and fall-run Chinook salmon species, and is expected to continue annually in the future. This Request for Proposals (RFP) solicits proposals for construction of the 2024 City of Sacramento/Water Forum's Lower American River Anadromous Fish Habitat Restoration Program site at River Bend. Project Duration Contracts may be extended on a year-to-year basis up to five (5) years. If needed, bidders may be asked to participate in an interview to discuss their proposal and approach to provide the Scope of Services during the week of March 25, 2024, prior to contract award. Verbal notification of award will occur the week of April 15, 2024. Anticipated contract award is May 14, 2024 per the City of Sacramento, City Council meeting schedule. Provide all material, labor, and equipment necessary to implement the Sacramento Water Forum's Salmonid Habitat Enhancement Program - River Bend Project in Rancho Cordova, California. Work includes but is not limited to temporary fence installation; SWPPP preparation and implementation; excavation; gravel/cobble material washing; sorting and hauling; in-river gravel placement, cobble placement, and fill placement; haul of excess material offsite; procurement, import and installation of large woody material (LWM); adherence to permit requirements; and planting and seeding. B. Provide all materials and components necessary to result in 100 percent complete construction of work and restoration of grounds shown on Drawings and detailed in Specifications. Direct questions to: City of Sacrament (Water Forum) 1330 21st Street Sacramento, CA 95811 Erica Bishop (916) 808-1997 cbec, inc, 2544 Industrial Blvd. West Sacramento, CA 95691 Benjamin Taber (916) 668-5247 Chris Hammersmark; (916) 668-5236 City departments shall require a five percent (5%) LBE participation level in City procurement opportunities for services or public projects of $250,000 or greater unless a waiver or reduction of the participation level is approved.

Award

Water / Sewer

$3,300,000.00

Public - City

Site Work

16

24

11

3

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
78
Bidding Soon
1,568
All Active Projects
654
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2024

September 20, 2024

img_map_placeholder

2300 Rod Beaudry Dr, Rancho Cordova, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.