EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in South Elgin, Illinois. Completed plans call for the renovation of a water / sewer project.

DESCRIPTION OF WORK: The Work consists of the removal and replacement in kind of the existing mixed liquor recycle pump in Aeration Zone 6 at the FRWRD West WRF, complete with all necessary accessories, tools and appurtenances for a complete installation, in accordance with the requirements of the Contract Documents. The existing recycle pump shall be returned to FRWRD upon its removal. BID SECURITY: Bid Security in the amount of not less than 10 % of the Bid shall accompany each Bid in accordance with the Instructions to Bidders. BID REJECTION / ACCEPTANCE: OWNER reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serve the interest of OWNER. The Contract Time, in which all work under this contract must be substantially complete is Ninety (90) calendar days, and must be fully complete and ready for final payment is One Hundred (120) calendar days from the Commencement Date

Award

Water / Sewer

$46,010.00

Public - City

Renovation

7

7

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Escalators and Moving Walks
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
176
Bidding Soon
2,698
All Active Projects
1,144
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

April 11, 2024

img_map_placeholder

1957 N La Fox St, South Elgin, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 West WRF Mixed Liquor Recycle Pump Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.