Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2024 at 8:00 PM

Updated March 21, 2024

Site work and paving for a mixed-use development in Groveport, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Groveport will receive bids for the 2024 Street Maintenance Program via Bid Express, until 2:00 p.m. E.S.T. on Thursday, March 7, 2024. The work for which proposals are invited consists of the furnishing of all labor, materials, equipment and services necessary for construction of various street improvements. Work to include approximately: Base Bid (In two components) as follows: Various Streets: Asphalt resurfacing and reconstruction of various streets and alleys requiring the placement of approximately 680 c.y. of asphalt pavement placement, pavement milling, pavement removal, pavement markings, various concrete work including concrete sidewalk replacement, concrete approaches and over 1000 feet of various curb replacement. Maple Alley Storm Sewer and Street Improvements: Removal of existing alley drainage pipe and structures, placement of about 400 feet of storm sewer pipe, ranging from 8-inch to 12-inch diameter, and placement of about 85 c.y. of asphalt pavement placement, along with other miscellaneous work. The Engineer's Estimated cost of construction for the work outlined in the plans and specifications in the Base Bid is $788,000.00 Alternate 1 (Add) Asphalt resurfacing and reconstruction of Saw Grove Court requiring the placement of approximately 70 c.y. of asphalt pavement placement, pavement milling, various concrete work including concrete sidewalk replacement, concrete approaches and curb spot replacement with other miscellaneous work. The Engineer's Estimated cost of construction for Add Alternate No. 1 is $41,000.00 Alternate 2 (Add) Asphalt resurfacing and reconstruction of Arbor Grove Court requiring the placement of approximately 60 c.y. of asphalt pavement placement, pavement milling, various concrete work including concrete sidewalk replacement, concrete approaches and curb spot replacement with other miscellaneous work. The Engineer's Estimated cost of construction for Add Alternate No. 2 is $47,000.00

Award

Roads / Highways

$715,152.00

Public - City

Paving, Site Work

9

3

6

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
111
Bidding Soon
2,108
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

April 8, 2024

Project location map

Maple St, Groveport, OH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed