BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a mixed-use development in Groveport, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Groveport will receive bids for the 2024 Street Maintenance Program via Bid Express, until 2:00 p.m. E.S.T. on Thursday, March 7, 2024. The work for which proposals are invited consists of the furnishing of all labor, materials, equipment and services necessary for construction of various street improvements. Work to include approximately: Base Bid (In two components) as follows: Various Streets: Asphalt resurfacing and reconstruction of various streets and alleys requiring the placement of approximately 680 c.y. of asphalt pavement placement, pavement milling, pavement removal, pavement markings, various concrete work including concrete sidewalk replacement, concrete approaches and over 1000 feet of various curb replacement. Maple Alley Storm Sewer and Street Improvements: Removal of existing alley drainage pipe and structures, placement of about 400 feet of storm sewer pipe, ranging from 8-inch to 12-inch diameter, and placement of about 85 c.y. of asphalt pavement placement, along with other miscellaneous work. The Engineer's Estimated cost of construction for the work outlined in the plans and specifications in the Base Bid is $788,000.00 Alternate 1 (Add) Asphalt resurfacing and reconstruction of Saw Grove Court requiring the placement of approximately 70 c.y. of asphalt pavement placement, pavement milling, various concrete work including concrete sidewalk replacement, concrete approaches and curb spot replacement with other miscellaneous work. The Engineer's Estimated cost of construction for Add Alternate No. 1 is $41,000.00 Alternate 2 (Add) Asphalt resurfacing and reconstruction of Arbor Grove Court requiring the placement of approximately 60 c.y. of asphalt pavement placement, pavement milling, various concrete work including concrete sidewalk replacement, concrete approaches and curb spot replacement with other miscellaneous work. The Engineer's Estimated cost of construction for Add Alternate No. 2 is $47,000.00

Award

Roads / Highways

$715,152.00

Public - City

Paving, Site Work

9

3

6

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
62
Bidding Soon
949
All Active Projects
385
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

April 8, 2024

img_map_placeholder

Maple St, Groveport, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.