BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work and paving for a road / highway in New Milford, Connecticut. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of June 6, 2026, this project is in the design phase. A timeline for construction has not yet been established. *Previous solicitation listed below for reference:* The Town of New Milford is requesting proposals from qualified professional engineering firms, licensed in the State of Connecticut, to provide Civil Engineering Design Services for the Town. The Town of New Milford would like to improve an existing signalized four way intersection at East St (Rt 202), Poplar St (Rt 202), Elm St and Elm St Ext. The design to include the partial realignment of the intersection and the creation of separate left turn lanes at approaches in the North/South direction. Pedestrian crossings should also be incorporated/improved to meet current standards. The improvements at this location are intended to reduce delays to vehicular traffic, while simultaneously providing safer crossings for pedestrians and bicyclists. Up to three conceptual designs are to be drafted to show improvements factors and cost estimates for each. East Street (Rt 202) is a state road and therefore the final plan must be approved by the Connecticut Department of Transportation. The Town reserves the right to host up to two Public Information Meetings regarding the project to which the awarded firm shall be present for to answer questions. Schedule for completion of work will be: three concepts w/ data and cost estimates due at sixty days from award; final design and completed/updated funding application due sixty days from date of approval of conceptual drawing. Question Submission Deadline: March 4, 2024, 8:00am Bid result ZOFS Engineering P.C

Design

Roads / Highways

$2,378,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
868
Active Projects
351
Bidding Soon
6,964
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

East St & Elm St, New Milford, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.