Renovation of a water / sewer project in Oak Harbor, Washington. Completed plans call for the renovation of a water / sewer project.

the Work Consists of Upgrading the Electrical System at the Ault Field Water Pump Station Including Replacing the Motor Control Centers; Installing New Circuit Breakers and Variable Frequency Drives; Installing the Associated Wiring, Conduits, and Other Appurtenances; and Other Related Work as Detailed in the Contract Documents. No Bidder May Withdraw Its Bid After the Hour Set for Opening Thereof or Before Award of Contract, Which Normally Occurs Within 45 Calendar Days After Bid Opening. The City of Oak Harbor Reserves the Right to Postpone the Award for a Period of 60 Calendar Days After Bid Opening. Each Bid Must Be Accompanied by a Cashier's Check, Money Order or Surety Bid Bond in the Amount of Not Less Than Five Percent (5%) of the Total Bid, Made Payable to the City of Oak Harbor. A Performance Bond as Well as a Labor and Material Payment Bond Will Be Required With the Contract. the City of Oak Harbor Reserves the Right to Reject Any or All Bids, to Waive Irregularities or Informalities in the Bid or in the Bidding, to Accept Any Alternate Bids, and to Make Such Award That It Deems to Be in Its Best Interest and Pursuant to the Terms of the General Conditions. The City of Oak Harbor Intends to Award a Contract to the Lowest Responsible and Responsive Bidder. Prebid site visits are scheduled on March 4, 5, 11, 12, 2024 at 1:00 pm local time and are subject to Department of the Navy security requirements. Site visits are limited to 3 people and will be escorted onto the site by City Staff Inquiries Should Be Directed to the City of Oak Harbor; Brett Arvidson, P.e., Project Manager, Email: Barvidson@oakha Rbor.org, Phone: (360)279-4521. The Engineers Opinion of Probable Cost Ranges From $450,000 to $525,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$407,307.00

Public - City

Renovation

26

10

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
53
Bidding Soon
2,015
All Active Projects
820
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

April 19, 2024

img_map_placeholder

To Be Determined, Oak Harbor, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.