Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Apple Valley, Minnesota. Completed plans call for site work for a playground / park / athletic field.
Request for Qualifications for CMAR Services for Redwood Park. The City of Apple Valley ("City") is seeking a construction manager at risk (CMAR) to provide preconstruction and construction services for upgrades and improvements to Redwood Park (the "Project"). The selected CMAR will need to coordinate their services and work with City staff and the City's selected landscape architect, Confluence Inc., during both the preconstruction and construction phases of the Project. Pursuant to Minnesota Statutes 471.463, the City is soliciting the submittal of qualifications from firms that provide CMAR services and have a proven track record of performing as a CMAR or projects similar to the Project. Scope of Services The scope of services required by the selected CMAR shall include the following: Preconstruction/Design Phases a. Provide a staffing plan for preconstruction phase services for the Citys review and approval. b. Provide a preliminary evaluation of the Citys overview/program for the Project, schedule and construction budget requirements, each in terms of the other. c. Advise the City and Architect on the selection, availability, and time requirements for procurement of materials, building systems and equipment. d. Prepare a procurement schedule for items that need to be ordered in advance for Architects review and Citys acceptance. e. Provide recommendations to the Architect and City regarding constructability of the Project and factors that will impact construction costs. f. Estimating and budget analysis services, including estimating and analysis of the Cost of the Work throughout the design phase based on regular participation in design meetings with the City staff and Architect and the drawings of the Architect; and providing an estimated Guaranteed Maximum Price (GMP) at the end of the Schematic Design and Design Development phases of the Project. This includes providing estimates of the Cost of the Work and GMP with more detail during the Schematic Design, Design Development, and Construction Documents phases until such time as the City and CMAR agree on a final GMP for the Project. g. Make recommendations for corrective action if the Cost of the Work exceeds the approved budget. h. Provide preliminary construction schedules throughout the preconstruction/design phases. i. Competitively bid all trade contract work for the Project from a list of qualified firms. The list of qualified firms shall be compiled jointly with the City. The list of qualified firms must be based on an open, competitive, and objective prequalification process in which the selection criteria, approved by the City, may include but is not limited to the firms experience as a constructor, including capacity of key personnel, technical competence, and capability to perform, past performance of the firm and its employees, safety record and compliance with state and federal law, availability to and familiarity with the project locale, SBE or DBE certification, and other considerations defined by the City and CMAR. j. Determine the GMP upon completion of the Construction Document phase by the Architect. The CMAR will be required to obtain bids and/or quantify costs for all work so that the GMP amendment may be executed within two weeks of completion of the Construction Document phase. k. Enter into contracts with qualified firms for the trade contract work necessary to complete the Project.
Post-Bid
Playgrounds / Parks / Athletic Fields
$16,100,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 8, 2024
March 3, 2025
311 150th St W, Apple Valley, MN
Related To This Project
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 21 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 19 2024
Apple Valley, MN
Bid Date: Mar 21 2024
Apple Valley, MN
Bid Date: Mar 20 2024
Apple Valley, MN
Bid Date: Apr 02 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 06 2024
Apple Valley, MN
--
Apple Valley, MN
Bid Date: Mar 05 2024
Apple Valley, MN
Bid Date: Mar 05 2024
Apple Valley, MN
Bid Date: Apr 18 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.