Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Bettendorf, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
This repair project includes removal and replacement or repair and adjustment of storm water catch basins (curb drop inlets) at various locations in Bettendorf. Work will require repair or replacement of structure tops, or removal of the intake walls down to or including the concrete base, and reconstruction of the walls, pavement box-out, and adjacent pavement patching. Steel castings will be reused unless broken or in need of updating. All work on this contract shall commence on or after May 1, 2024, as weather permits. All work on this contract shall be completed within 90 calendar days from the agreed upon start date, or by August 31, 2024, whichever comes first. The beginning and completion dates will be included in and made part of the contract between the successful bidder and the City. Liquidated damages in the amount of Five Hundred Dollars and no/100 ($500.00) per calendar day shall be charged for every day past the completion date. Each proposal must be accompanied by a certified or cashier's check drawn on an Iowa bank or a bank chartered under the laws of the United States or by a Bid Bond with corporate surety satisfactory to the City of Bettendorf in the amount of ten (10) percent of the bid, made payable to the City Treasurer of the City of Bettendorf, Iowa, and may be cashed or claim made against the bond by the Treasurer of the City of Bettendorf, Iowa, as liquidated damages in the event the successful bidder fails to enter into a contract within ten (10) days and post bond satisfactory to the City for the faithful performance of the work. Checks or Bid Bonds of the three lowest bidders may be retained for a period of not to exceed thirty (30) days or until a contract is awarded or rejection is made, whichever is sooner. Other checks and BidBonds will be returned after the tabulation of the bids is completed. The successful bidder will be required to furnish a performance and maintenance bond equal to One Hundred Percent (100%) of the contract price. Said bond is to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and shall also guarantee the maintenance of the improvement for a period of four (4) years from and after its completion and acceptance by the City. The City reserves the right to reject any or all proposals and to waive technicalities and irregularities if deemed necessary and approved by City Council.
Award
Roads / Highways
$166,384.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2024
May 1, 2024
Multiple Locations, Bettendorf, IA
Related To This Project
Bettendorf, IA
Bid Date: Mar 12 2024
Bettendorf, IA
Bid Date: Mar 12 2024
Bettendorf, IA
Bid Date: Mar 26 2024
Bettendorf, IA
Bid Date: Mar 15 2024
Bettendorf, IA
Bid Date: Mar 28 2024
Bettendorf, IA
Bid Date: Mar 26 2024
Bettendorf, IA
Bid Date: Mar 22 2024
Bettendorf, IA
Bid Date: Mar 08 2024
Bettendorf, IA
Bid Date: Mar 08 2024
Bettendorf, IA
Bid Date: Feb 28 2024
Bettendorf, IA
Bid Date: Mar 08 2024
Bettendorf, IA
Bid Date: Mar 01 2024
Bettendorf, IA
Bid Date: Mar 07 2024
Bettendorf, IA
Bid Date: Feb 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.