BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in River Falls, Wisconsin. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; and water / sewer project.

Mill & Overlay specified street sections and adjust associated manhole covers and valve boxes. Alternates for the Mill & Overlay of a 8' wide asphaltic trail, and an asphaltic basketball court. Contact Chris Buntjer at 715-426-3412 or cbuntjer@rfcity.org to arrange a site visit. Est. Completion Date: June 30, 2024 The major work includes the following approximate quantities of work: Mill Bituminous Pavement (Roadway) 8,100 S.Y. HMA Pavement 5 LT 58-28 S (Roadway) 840 Ton Adjusting Manhole Covers 11 Each Adjusting Water Valves 13 Each Alternate 1: Mill, Shape, & Overlay 8' trail with 2" HMA 1,500 L.F Alternate 2: Mill, Shape, & Overlay Basketball Court with 2" HMA 280 S.Y. Said work shall be in accordance with the Bidding Documents prepared by the City of River Falls Engineering Department. Any questions concerning this project shall be directed to Senior Engineer Chris Buntjer, cbuntjer@rcity.org, 715-425-3412. SCOPE OF PROJECT. 1. The project Scope of Work generally includes but is not limited to the following: a. Milling of asphalt pavements and overlaying with hot mix asphalt of various streets throughout the City of River Falls as shown in Appendix F. b. All streets will receive a 1 3/4 " mill and overlay. c. Under the base bid, millings shall become property of the Owner and be hauled from the project area to a City owned parcel adjacent to the City's Wastewater Treatment Facility as the "Deliver Asphalt Millings to City" bid item. Conditions of "Earthwork (A)(2)" in Appendix A apply. d. Patching deteriorated portions of streets to be overlaid and other miscellaneous streets or pathways within the City as directed by Engineer. This patching shall consist of: 1) Saw cutting the edges of marked removal area. 2) Removing existing asphalt pavement. 3) Tacking edges of patch. 4) Replacing removed asphalt surface with new bituminous asphalt. 5) Tack coat. 6) Adjustment of miscellaneous manhole and gate valve castings when so ordered by engineer. 7) Placement of a 1 3/4 " asphalt pavement wear course over existing road surface on mill and overlay streets. 8) Traffic control. e. Epoxy pavement markings per WisDOT Standard 646: 1) Match existing pavement markings on Paulson Road. 2) Mark pavement on Riverside Drive from the intersection with Paulson Road going east 180', adding new markings including crosswalk lines, a stop bar, right and left turn arrows, a double yellow centerline, and a solid white turn lane.

Bid Results

Roads / Highways

$186,360.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
68
Bidding Soon
1,757
All Active Projects
599
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 15, 2024

March 26, 2024

June 29, 2024

img_map_placeholder

Multiple Locations, River Falls, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.