Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Kirkwood, Missouri. Contact the soliciting agency for additional information.
Question Cutoff Date: 3/5/2024 06:00 PM (ET) o Issuance of CxA RFP Monday 02/26 o Deadline for CxA RFP response 2:00 on Friday 03/08 o Potential interviews (if necessary) 03/12 or 03/13 o Selection of CxA 03/15 o AIA C203 contract finalization 03/22 o Kirkwood City Council Approval TBD on 04/04 o Construction Phase 1 start approximately March 1, 2024 o Construction Phase 2 start approximately September 1, 2024 o Substantial Completion Phase 1 anticipated August 1, 2024 Page 3 of 6 o Substantial Completion Phase 2 anticipated August 1, 2025 o Project Final Completion anticipated September 1, 2025 o Warranty Period anticipated September 1, 2026 The City of Kirkwood (hereafter noted as "the City") is requesting sealed proposals for Commissioning Agent - Kirkwood Community Center Renovations. Qualified Firms (hereafter noted as "Firm") are invited to submit sealed proposals to provide Commissioning Agent - Kirkwood Community Center Renovations for the City of Kirkwood in accordance with the specifications contained herein. **All questions pertaining to this opportunity must be asked via Ionwave.** No Faxed, Hand Delivered, Mailed, or Emailed Responses will be accepted. The organization of the Specifications into Divisions, Sections and Subsections, and the arrangement of the Plans shall not in and of itself divide the Work among the Contractors and Subcontractors nor establish the Work to be performed by any trade. The "Scope of Work" and "Work Included" under each respective sectional heading, nevertheless, attempts to segregate the Work by known contracting activities. In the final analysis, the General Contractor shall be responsible for scoping the work for each trade based on local practice to include all the Work of a given type in the related proposal, regardless of where and how identified in the Bid Documents. The Architect/Engineer may issue revisions, modifications, attachments or other documentation in the form of addenda to the Project (Bid) Documents during the bidding phase only to change, detail or clarify the scope of the Work. The removal and disposal of asbestos based insulation or other hazardous materials applied to, or contained in, the mechanical equipment, and material designated to be demolished shall not be included in the scope of the work regardless if known ahead of time or discovered in the course of performing the Work. In the latter case, the Contractor shall notify the Architect/Engineer and shall not pursue that portion of the Work until others have removed the asbestos-based material. The removal and disposal of asbestos-based material shall be arranged by and to the account of the Owner and conducted separately from the demolition work. The City reserves the right to reject any or all of the RFP responses, to waive technicalities, to select on any response that is most advantageous, and to make investigations concerning the experience and ability of the proposer to perform the work. Responses shall be in electronic format intended for printing in letter size format and shall be signed by an authorized officer of the company.
Post-Bid
Clubhouse / Community Centers
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2024
April 22, 2024
111 S Geyer Rd, Kirkwood, MO
Related To This Project
Kirkwood, MO
Bid Date: Mar 14 2024
Kirkwood, MO
Bid Date: Mar 15 2024
Kirkwood, MO
Bid Date: Mar 20 2024
Kirkwood, MO
Bid Date: Mar 11 2024
Kirkwood, MO
Bid Date: Apr 17 2024
Kirkwood, MO
Bid Date: Apr 05 2024
Kirkwood, MO
Bid Date: Apr 22 2024
Kirkwood, MO
Bid Date: Apr 22 2024
Kirkwood, MO
Bid Date: Mar 08 2024
Kirkwood, MO
Bid Date: Mar 01 2024
Kirkwood, MO
Bid Date: Feb 29 2024
Kirkwood, MO
Bid Date: Feb 23 2024
Kirkwood, MO
Bid Date: Feb 27 2024
Kirkwood, MO
Bid Date: Mar 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.