Published May 28, 2024 at 8:00 PM

Updated May 29, 2024

Site work for a water / sewer project in Kirkwood, Missouri. Completed plans call for site work for a water / sewer project.

The work consists of replacing approximately 1,700 feet of 6" and 8" pipe with 6" and 8" PVC and ductile iron pipe, designed to be installed utilizing both open-cut and trenchless methods. All necessary service transfers, hydrants, valves, and appurtenances are included. Existing pipe shall be abandoned in place. If the restoration still is not completed, City forces shall complete the restoration at a unit price of $250 per square yard for asphalt repairs and $200 per square yard for earth work. Any work performed by City forces will be charged against the contractor's monthly or final invoice. The successful bidder agrees that, upon completion of the proposal and upon the issuance of a Notice to Proceed, the work shall be completed within 90 calendar days from the date of the Notice to Proceed, and that should the contractor fail to complete the work in the time specified or such additional time as may be allowed by the Water Superintendent under the contract, the amount of liquidated damages to be recovered shall be $250 per calendar day. Question Deadline 04/10/2024 at 5:00 PM CT A Payment and Performance Bond is required if the total contract value proposed is greater than or equal to $50,000. Contractor shall procure and maintain a performance and payment Bond (the "Bond") for the benefit of the City as required by the laws of the State of Missouri and in an amount not less than one hundred percent (100%) of the aggregate amount of the contract. The Bond shall serve as security for the faithful performance of this contract, including maintenance provisions, and for the payments of all persons performing labor and furnishing materials in connection with this contract. The premiums on the Bond shall be paid by the contractor. The Bond shall remain in full force and effect during the life of the contract and during the term of any warranty required by the specifications and shall be held in the custody of the Procurement Director. Notifications of award will be made by the Procurement Department following passage of a resolution by City Council accepting the proposal. The proposal must remain valid for at least 90 days after submittal date. It is the intent of the City to contract for this service as soon as possible. The City reserves the right to reject any and all bids as necessary to serve the best interests of the City, including, without limitation, non- conforming, non-responsive, unbalanced or conditional bids. The City will evaluate all conforming, responsive, balanced and unconditional bids and has the discretion to determine the lowest, responsible bidder.

Award

Water / Sewer

$828,130.00

Public - City

Site Work

24

15

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
91
Bidding Soon
1,236
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2024

June 21, 2024

Project location map

Big Bend Rd, Kirkwood, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.