BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Charleston, West Virginia. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

A five percent (5%) Bid Bond or certified cashier's check must accompany all Bids. Coonskin Park - Elk River Trail Slip Repairs 1. Installation of approximately 1,050 square yards of 1.5" asphalt overlay for repair of paved cart path used during construction activities. 2. Installation of approximately 1,050 square yards of 2" asphalt base course for repair of paved cart path used during construction activities. 3. Excavation for and installation of a 100 LF H-Pile Retaining Wall with 4 deadman caissons and 4 tieback anchors, 21 drilled shafts, concrete in shafts and tie backs, precast concrete lagging, steel piling, splicing and installation, 100 LF of 10 ft. wide asphalt road restoration, relocation of existing force main, and related appurtenances as shown on the contract drawings. 4. Excavation for and installation of a 130 LF H-Pile Retaining Wall with 4 deadman caissons and 5 tieback anchors, 27 drilled shafts, concrete in shafts and tie backs, precast concrete lagging, steel piling, splicing and installation, 130 LF of 10ft. The Kanawha County Parks & Recreation Commission will consider informal any bid not prepared and submitted in accordance with the provisions hereof and reserves the right to reject any and/or all Bids DAVIS-BACON ACT Davis-Bacon (Federal) Prevailing Wage Determinations must be used in addition to any State prevailing wage rates. The contractor shall use the higher rate for each job classification (between State wage rates and Davis-Bacon wage rates) for paying labor employed in the construction of this project. COPELAND "ANTIKICKBACK" ACT Bidders on this work will be required to comply with 18 U.S.C. 874, 40 U.S.C. 3145, and the requirements of 29 C.F.R. Part 3 as may be applicable. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT Bidders on this work will be required to comply with statutory requirements on work hours and safety standards. Under 40 U.S.C. 3702, each contractor must base wages for every mechanic and laborer on a standard 40-hour work week. Work over 40 hours is allowed, so long as the worker is paid at least one and a half times the base pay rate for all hours worked over 40 hours in the work week.

Award

Playgrounds / Parks / Athletic Fields

$1,392,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
42
Bidding Soon
408
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

April 10, 2024

img_map_placeholder

375 Henry C Hoppy Shores Dr, Charleston, WV

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.