BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Gatineau, Quebec. Completed plans call for the renovation of a municipal facility.

Reference Number 0000265158 Question Acceptance Deadline Mar 08, 2024 02:00 PM EST Pricing Lump sum Carpet shall be removed and replaced with high traffic commercial grade carpet tile throughout the common areas. Proceed with 2 floors (maybe 3 if funds allow) of carpet replacement prioritized via the carpet master plan completed in 2019-20 (GOC990571). (SPECIFY SQUARE FOOTAGE OF CARPET TO BE REPLACED). After removal of carpet, existing condition of substrate shall be assessed before application of new carpet tile. Existing removed carpet to be disposed & recycled as required by environmental legislations and standards while providing proof certification. Ensure flooring is prepped while providing and installing new carpet tile including adhesive square connectors, new base, transition strips & carpet accessories. All items to match base building standard, where applicable. Lift/Move furniture as required for installation and return back to same location after work is done. Glue-free installation to be used for installation of new carpet tile. New baseboards shall have a high contrast colour to differentiate between carpet floor surface. Carpet shall not have a strong visual pattern and provide minimal glare as per the latest accessibility standards. The carpet pile texture should be level loop, level cut or uncut. The maximum pad and pile height of the carpet should not exceed 13 mm. A bid bond in a commercially reasonable form or an irrevocable standby letter of credit issued by a financial institution authorized to conduct business in Canada as a Schedule I or Schedule II chartered bank in the amount of at least 10% of the Bid Price and that shall be in effect until forty-five (45) calendar days following Closing Date. A suretys consent indicating that, in accordance with section 5.18.1. of this ITT, the surety company will furnish the contract security which shall include a 50% performance bond and a 50% labour and materials payment bond of the Bid Price or a consent from the Schedule I or Schedule II chartered bank that an irrevocable standby letter of credit in the amount of 50% of the Bid Price will be furnished. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

Bid Results

Municipal

$599,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
44
Bidding Soon
650
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2024

April 15, 2024

img_map_placeholder

140 Prom. du Portage, Gatineau, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.