Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Gatineau, Quebec. Completed plans call for the renovation of a municipal facility.
Reference Number 0000265158 Question Acceptance Deadline Mar 08, 2024 02:00 PM EST Pricing Lump sum Carpet shall be removed and replaced with high traffic commercial grade carpet tile throughout the common areas. Proceed with 2 floors (maybe 3 if funds allow) of carpet replacement prioritized via the carpet master plan completed in 2019-20 (GOC990571). (SPECIFY SQUARE FOOTAGE OF CARPET TO BE REPLACED). After removal of carpet, existing condition of substrate shall be assessed before application of new carpet tile. Existing removed carpet to be disposed & recycled as required by environmental legislations and standards while providing proof certification. Ensure flooring is prepped while providing and installing new carpet tile including adhesive square connectors, new base, transition strips & carpet accessories. All items to match base building standard, where applicable. Lift/Move furniture as required for installation and return back to same location after work is done. Glue-free installation to be used for installation of new carpet tile. New baseboards shall have a high contrast colour to differentiate between carpet floor surface. Carpet shall not have a strong visual pattern and provide minimal glare as per the latest accessibility standards. The carpet pile texture should be level loop, level cut or uncut. The maximum pad and pile height of the carpet should not exceed 13 mm. A bid bond in a commercially reasonable form or an irrevocable standby letter of credit issued by a financial institution authorized to conduct business in Canada as a Schedule I or Schedule II chartered bank in the amount of at least 10% of the Bid Price and that shall be in effect until forty-five (45) calendar days following Closing Date. A suretys consent indicating that, in accordance with section 5.18.1. of this ITT, the surety company will furnish the contract security which shall include a 50% performance bond and a 50% labour and materials payment bond of the Bid Price or a consent from the Schedule I or Schedule II chartered bank that an irrevocable standby letter of credit in the amount of 50% of the Bid Price will be furnished. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.
Bid Results
Municipal
$599,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 15, 2024
April 15, 2024
140 Prom. du Portage, Gatineau, QC
Related To This Project
Gatineau, QC
Bid Date: Mar 12 2024
Gatineau, QC
Bid Date: Mar 27 2024
Gatineau, QC
Bid Date: Mar 21 2024
Gatineau, QC
Bid Date: Mar 14 2024
Gatineau, QC
Bid Date: Mar 27 2024
Gatineau, QC
Bid Date: Mar 14 2024
Gatineau, QC
Bid Date: Mar 26 2024
Gatineau, QC
Bid Date: Apr 02 2024
Gatineau, QC
--
Gatineau, QC
Bid Date: Mar 04 2024
Gatineau, QC
Bid Date: Mar 22 2024
Gatineau, QC
Bid Date: Apr 11 2024
Gatineau, QC
Bid Date: Mar 27 2024
Complete Painting - École Le Carrefour Primaire International - Éd. George-Étienne-Cartier - 5325317
Gatineau, QC
Bid Date: Mar 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.