Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Morrison, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000344141 This Contract provides for the removal of the existing failed coating system within the western cell of the Red Rocks Amphitheater Tank. 1. Remove Existing Coatings - Remove all visible coating, particularly uncured areas, loose or unadhered coatings, and other soluble contaminants. It is anticipated this will an abrasive blast in accordance with SSPC-SP13/NACE 6 Surface Preparation of Concrete ASTM D4259, or other appropriate method to achieve the removal of the coating. Finished surface profile is critical as it is anticipated that the tank interior will be recoated, as the tank is to be demolished and replaced in the next few years. 2. If there are significant cracks, or voids that are created by the work. It is possible that such areas may be repaired or rehabilitated, by negotiated change order. 3. Contractors to refer to Exhibit A and Exhibit B for an understanding of the project location, access, and approximate quantities for the anticipated scope of work. Existing coating is GACO LM 60 Urethane (Applied 2006) with a noted thickness of 64 mils applied. The contractor shall be responsible for field verification of actual dimensions and respective quantities, including excess material required to be ordered to prevent shortages. Contractor shall be responsible for all aspects of the work, including provisions for entry, scaffolding, ventilation etc. 4. Contractor shall collect all spent blast material and debris and dispose of it offsite. 5. Following the coatings removal, Contractor shall clean, and disinfect the tank in order to put back in service. All wash down water must be pumped out and disposed of offsite. Contractor shall not be allowed to release waste down the tank drain piping. 6. Contractor shall disconnect the existing tank mixer, and provide to Town for temporary storage, and then reinstall at the time the tank will be placed back in service. Question Deadline 03/29/2024 at 12:00 AM MT Questions shall be directed in writing to Fritz Fouts ffouts@morrisonco.us The Town reserves the right to award the contract by sections, to reject any or all Bids, and to waive any informalities and irregularities therein. All Bidders agree that damage or claim shall not be brought by any Bidder because of rejections, nor shall the Bidders seek any recourse of any kind against the Town because of such rejections. This Contract provides for the removal of the existing failed coating system within the western cell of the Red Rocks Amphitheater Tank. 1. Remove Existing Coatings - Remove all visible coating, particularly uncured areas, loose or unadhered coatings, and other soluble contaminants. It is anticipated this will require an abrasive blast in accordance with SSPCSP13/NACE 6 Surface Preparation of Concrete ASTM D4259, or other appropriate method to achieve the removal of the coating. Finished surface profile is not critical as it is not anticipated that the tank interior will be recoated, as the tank is to be demolished and replaced in the next few years. 2. If there are significant cracks, or voids that are created by the work. It is possible that such areas may be repaired or rehabilitated, by negotiated change order. 3. Contractors to refer to Exhibit A and Exhibit B for an understanding of the project location, access, and approximate quantities for the anticipated scope of work. Existing coating is GACO LM 60 Urethane (Applied 2006) with a noted thickness of 64 mils applied. The contractor shall be responsible for field verification of actual dimensions and respective quantities, including excess material required to be ordered to prevent shortages. Contractor shall be responsible for all aspects of the work, including provisions for entry, scaffolding, ventilation etc. 4. Contractor shall collect all spent blast material and debris and dispose of it offsite. 5. Following the coatings removal, Contractor shall clean, and disinfect the tank in order to put back in service. All wash down water must be pumped out and disposed of offsite. Contractor shall not be allowed to release waste down the tank drain piping. 6. Contractor shall disconnect the existing tank mixer, and provide to Town for temporary storage, and then reinstall at the time the tank will be placed back in service.
Award
Water / Sewer
$202,497.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2024
May 9, 2024
18300 W Alameda Pkwy, Morrison, CO
Related To This Project
Morrison, CO
Bid Date: May 16 2024
Morrison, CO
Bid Date: Aug 15 2024
Morrison, CO
--
Morrison, CO
Bid Date: Oct 09 2024
Morrison, CO
--
Morrison, CO
Bid Date: Feb 15 2024
Morrison, CO
Bid Date: Jun 06 2024
Morrison, CO
Bid Date: Oct 25 2023
Morrison, CO
Bid Date: Oct 24 2023
Morrison, CO
Bid Date: Mar 31 2022
Morrison, CO
Bid Date: Oct 12 2023
Morrison, CO
Bid Date: Dec 16 2021
Morrison, CO
Bid Date: Dec 20 2021
Morrison, CO
Bid Date: Sep 27 2023
Morrison, CO
Bid Date: Sep 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.