BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Red Earth Creek, Alberta. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

Subgrade Preparation, GBC, ACP (EPS), Concrete and Other Work Direct all inquiries to: Julie L. Kitz, P. Eng. Milestone Engineering Services Ltd. P.O. Box 458 2195 Mistassiniy Road North Wabasca AB, T0G 2K0 Cell: (780) 260-0349 Email: jkitz@mesl.ca The Bidder is encouraged to submit questions as early as possible during the tendering period. Red Earth Creek 2024 Paving Program Schedule "A" - Walking Trail & Parking Patching & Overlay - 0.7 km Schedule "B" - Cardinal Road Subgrade Preparation, Base & Paving - 0.9 km Schedule "C" - Community Hall Parking Lot Subgrade Preparation, Base, Paving & Concrete - 7200 m2 Schedule "D" - Transportation Road Subgrade Preparation, Base & Paving - 2.6 km Schedule "E" - South Service Road Grading, Base, Paving & Concrete - 0.9 km The scope of work for this project includes, but is not limited to, the following: Subgrade Excavation and repair of soft yielding areas - 2,950 m3 Subgrade Preparation, Woven Geotextile and Geogrid - 64,200 m2 Haul, placement and compaction of Clay Borrow Haul, placement and compaction of Granular Base Course - 29,530 t Haul, placement and compaction of Asphalt Concrete Pavement - 11,590 t Standard & Reverse Curb & Gutter - 595 m Sidewalk & Ramps Topsoil Placement and Seeding Application of Roadway Paint Lines and Messages Removal and disposal of existing CSP's Installation of new CSP's Minor Ditch Grading

Post-Bid

Roads / Highways

$500,000.00

Public - City

Site Work

23

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
4
All Active Projects
2
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

May 1, 2024

img_map_placeholder

Multiple Locations, Red Earth Creek, AB


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.