Remodeling of a clubhouse / community center in Somerton, Arizona. Completed plans call for the remodel of a clubhouse / community center.
The City of Somerton is seeking a Licensed general Contractor for the Somerton Community Center remodel project. This Request for Proposals ("RFP") describes the project, the required scope of services, the selection process, and the minimum information that must be included in the submittal. The scope of the project is further defined in Attachment - 'A' (Community Center Remodel). Failure to submit information in accordance with the RFP requirements and procedures may cause disqualification. Based on this RFP, the city intends to select one licensed general contractor. If the City is unable to reach an agreement with the selected contractor, the city retains the option to negotiate with another. The award of the contract for building remodel will be to the contractor whose professional qualifications,, experience, and. performance plan demonstrates that it will competently satisfy the requirements in this RFP within the City's budget. This RFP does not commit the City to award any contract, defray any costs incurred in the preparation of a submittal pursuant to this RFP, or in any resulting negotiations, or to procure contracts for work. Respondents to this RFP ("Respondents") will be responsible for verifying and inspecting the site prior to submitting a response to this RFP and will assume full responsibility for having familiarized himself or herself with the locality and local conditions that may in any manner affect the Work to be done. Submission of a response shall be evidence that the Respondent has made such examination and is satisfied as to the conditions to be encountered in performing the Work and as to the requirements of this RFP. Question Deadline 03/15/2024 at 2:00 PM MT All inquiries or requests for interpretation relative to this RFP must be submitted in writing to Rodney Rinehart, interim Parks & Recreation Director, at 143 North State Avenue, Somerton, AZ 85350; rodneyrinehart@somertonaz.gov to be considered. The City of Somerton seeks to remodel the existing community center. As described in the Scope of Work Attachment 'A', it is envisioned that the remodel will include upgrades to the following: 1. Men Restrooms: 2 sinks, 2 mirrors, 2 urinals and flush valves, 2 toilets and flush valves, 2 hand bars, 2~9" paper dispensers, 1-soap dispenser, 1 floor drain, floor tile. 2. Women Restrooms: 2 sinks, 2 mirrors, 5 toilets, 2 hand bars, 5-9" paper dispensers, 5 sanitary dispensers, 1 soap dispenser, 1 floor drain, floor tile. 3. Both restrooms and dividers get new paint. 4. Remove door and opening (frame) 5. Additional labor Submittals will be evaluated by a committee based on the information submitted. After initial screening, the selection committee may select the lowest bidder but most qualified for this project for further evaluation. Interviews may be conducted as part of the final selection process. However, the city may, as its option, select a firm or firms strictly based on the initial submittals, without short-listing firms or conducting oral interviews. Further, the city has the option to reject all submittals. Final authority to approve the selection of a contractor and final acceptance of any agreement(s) rests with the City Council. This RFP does not commit the City of Somerton to award a contract, to defray any costs incurred in the preparation of a submittal, or to procure or contract for services. The City reserves the right to accept or reject any or all proposals Anticipated award of contract APRIL3RD, 2024 1. Remove existing sinks, and Supply and Install approved sink and counter with all necessary connections and fittings. (Two Bathrooms) 2. Remove the existing faucets and reinstall them after replacing the sink and counter with all necessary connections and fittings. (Two Bathrooms) 3. Supply and install soap dispensers, toilet paper holders and hand dryers. (Two Bathrooms) 4. Remove existing toilets and urinals, supply and install new toilets with all necessary connections and fittings. Work shall include any drainage or plumbing modifications. (Two Bathrooms) 5. Supply and install new floor and wall tiles. (Two Bathrooms) 6. Remove existing mirrors, supply and install new mirrors, same size as the ones removed. (Two Bathrooms) 7. Replace doors and door frames. (Two Bathrooms) 8. Paint and install light fixtures. (Two Bathrooms) 9. Provide and install walls trims. (Two Bathrooms) 10. Provide and install changing tables. (Two Bathrooms)
Post-Bid
Clubhouse / Community Centers
$1,000,000.00
Public - City
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2024
May 20, 2024
801 W Main St, Somerton, AZ
Related To This Project
Somerton, AZ
Bid Date: Mar 15 2024
Somerton, AZ
Bid Date: Jul 17 2024
Somerton, AZ
Bid Date: Mar 29 2024
Somerton, AZ
Bid Date: May 28 2024
Somerton, AZ
Bid Date: Jun 13 2024
Somerton, AZ
--
Somerton, AZ
Bid Date: Jun 28 2024
Somerton, AZ
--
Somerton, AZ
--
Somerton, AZ
Bid Date: Dec 01 2023
Somerton, AZ
--
Somerton, AZ
Bid Date: Mar 03 2022
Somerton, AZ
Bid Date: Mar 03 2022
Somerton, AZ
Bid Date: Sep 08 2023
Somerton, AZ
Bid Date: Jun 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.