Demolition, site work, paving and new construction of a civil project in Arlington, Massachusetts. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Potential contractors are invited to visit the project site and send written questions via email to the Town of Arlington Department of Public Works; Engineering Division no later than 2 PM on March 18, 2024, at engineering@town.arlington.ma.us This Section of the specifications covering the scope and sequence of work for the Mystic Street Bridge Reconstruction Project in Arlington, Massachusetts, including: The scope of work includes the complete replacement of the existing granite masonry and reinforced concrete culvert. The work shall include the demolition of the existing masonry and reinforced concrete, the construction of the proposed multiple steel beam with reinforced concrete deck single span bridge supported on drilled micropile supported integral abutments, the control of water during demolition and construction, bridge excavation, filter fabric, crushed stone, gravel borrow for backfilling, placed riprap, steel bridge railing, approach slabs, paving over the proposed bridge and the approaches and other incidental and related tasks required for the complete reconstruction of the Mystic Street Bridge over Mill Brook in the Town of Arlington, Massachusetts. The Plan Set consists of 25 sheets including Sheets 1 thru 18 which were reviewed and approved by MassDOT on August 1, 2022 and the remaining Sheets 19 thru 25. Phased removal and replacement of existing Mystic Street Bridge over Mill Brook. Work to include Bridge Construction Site Work Mystic Street Bridge Reconstruction. Project consists of phased removal and replacement of existing bridge over Mill Brook, including bridge construction, site work, demolition, pile installation, utility work and road work. Bridge spans less than 20 feet and was constructed circa 1850.

Bid Results

Bridges / Tunnels

$2,950,000.00

Public - City

Demolition, New Construction, Paving, Site Work

32

14

4

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
147
Bidding Soon
2,828
All Active Projects
1,188
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

June 24, 2024

img_map_placeholder

Mystic St, Arlington, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.