Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 29, 2024 at 8:00 PM

Updated March 30, 2024

Site work and paving for a road / highway in Holliston, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Holliston DPW - Highway is seeking sealed bids for Milling (Cold Planing) and Overlay (Paving) of a section of Washington Street from Curve to Locust Streets Description of the Work – The project segment runs on Washington Street from Curve Street to Locust Street. The length of road being cold planed and paved is 2753 feet and width is an average of 24 feet. A minimum 2 inches of asphalt will be removed and replaced throughout the project. Contractor is responsible for disposal of the surface millings. SUPERPAVE SURFACE COURSE 9.5 (SSC-9.5) will be used for resurfacing. Intersecting streets will be cold planed and resurfaced back from Washington Street. Please review the enclosed Scope of Services and provide any questions in writing to Robert Walker at the Holliston Highway Department, 63 Arch Street, Holliston, MA 01746 before 3:00 p.m. on March 8, 2024 or via email to Robert Walker at: walkerr@holliston.k12.ma.us Time Schedule – Start date on or about April 8, 2024 and completed on or about May 3, 2024.

Bid Results

Roads / Highways

$201,632.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
893
Active Projects
434
Bidding Soon
5,836
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 8, 2024

Project location map

Multiple Locations, Holliston, MA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed