BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Buffalo, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; water / sewer project; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The Owner is the City of Buffalo, and the work sites are located in the City of Buffalo. The project limits are on Niagara Street from Porter Avenue to Hampshire Street. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Roadway asphalt repair, curb extensions at signalized intersections; spot replacement of drainage structures; spot curb and underdrain replacements; complete traffic signal replacements; new LED streetlights and associated components; spot sidewalk and driveway replacements; water line work; tree plantings; signs and pavement markings; maintenance and protection of traffic and other incidental improvements. Questions regarding the Contract Documents should be directed to pgalbo@watts-ae.com. Bidders shall promptly notify pgalbo@watts-ae.com of any errors, omissions, conflicts or ambiguity within the Contract Documents no later than 3 days prior to bid opening. Question Deadline 03/15/2024 The DBE goal for this project is: 6.0% There are no goals for MBE, WBE and SDVOB participation. NOTE: Bidders must submit their DBE participation commitments on company letterhead with the bid. The EEO Employment goals for this project are: 7.7% Minority Employment Goal 6.9% Women Employment Goal All bids must include the completed Bid Form, Non-Collusive Bidding and Disbarment Certifications, and Lobbying Certifications. This is a unit price bid as described in the Instructions to Bidders. No bidder may withdraw his/her bid within forty-five (45) calendar days after the actual date of the opening thereof. The Bidder to whom the Contract is awarded will be required to furnish Performance, Payment and Guarantee Bonds from an acceptable Surety Company for an amount not less than 100% of the accepted bid. The City of Buffalo reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids. All bids are subject to final review and approval by the City of Buffalo Common Council before any award of contract may be made. Receipt of bids by the City of Buffalo shall not be construed as authority to bind the City of Buffalo. The work will be substantially completed 294 working days from Notice to Proceed The City of Buffalo will not be responsible for full or partial set of Contract Documents, including any Addenda obtained from any other source. The City of Buffalo reserves the right to reject any and all bids and to waive any informalities therein. Cost Range: $8M - $11M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Sidewalks / Parking Lot

$6,939,346.00

Public - City

Outdoor Lighting, Paving, Site Work

179

19

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
417
Active Projects
224
Bidding Soon
3,916
All Active Projects
1,519
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 20, 2024

May 20, 2024

July 4, 2025

img_map_placeholder

Niagara St, Buffalo, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.