Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2024 at 8:00 PM

Updated April 12, 2024

Site work and paving for a mixed-use development in Chino Hills, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Work comprises, but is not limited to mobilization; traffic control; 2-inch full-width grind and 2-inch AC Overlay; selective 2-inch grind and 2-inch AC overlay; 5- foot wide tapered grind (0.00-0.12-depth); 1.5 inch full width AC overlay; adjustment of utility manhole covers and water valve can covers as necessary; application of Type I conventional slurry; apply crack seal; sawcut and remove 8-inch thick stamped concrete crosswalk and replace with 4-inches of approved CAB and 4-inch AC Overlay; remove and replace stamped AC crosswalk; remove and install traffic control loops and restoration of striping, pavement markings/ markers, and legends in the various residential streets in Chino Hills. Contractor s License: Class A or Class C12 Bid Bond 10% Performance Bond 100%; Payment Bond 100% Technical questions regarding this project should be submitted no later than 2:00 pm on Thursday, March 14, 2024, to the Project Manager, Victor Yanez, Phone (909) 364-2755; Email: vyanez@chinohills.org. The Contractor may not perform any Work until the City gives the Contractor a signed Notice to Proceed. The Contractor shall commence the work required by this Agreement within 10 calendar days of the date specified in the Notice to Proceed. The Contractor will fully complete the Work within forty (40) working days

Award

Roads / Highways

$928,743.00

Public - City

Paving, Site Work

4

6

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
661
Active Projects
263
Bidding Soon
4,563
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

May 27, 2024

Project location map

Multiple Locations, Chino Hills, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed