BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a warehouse / distribution facility in Mobile, Alabama. Completed plans call for the renovation of a warehouse / distribution facility.

The work consists principally of providing bonds, labor, materials, equipment, and supervision necessary for, but not limited to, the removal of the existing single-ply membrane system, installation/replacement of wood decking, installation/replacement of the gutter system, reinstallation of existing ventilators, installation of twelve (12) new ventilators, and installation of the new roofing system. as indicated in the Contract Drawings and Specifications. The Alabama State Port Authority will utilize its sales tax exemption status on this project. A Guarantee will be required with each bid as follows: (5%) percent of the amount bid, but in no event more than Ten Thousand ($10,000) Dollars, shall be furnished in the form of a certified check or bid bond payable to the Alabama State Port Authority. Performance and Payment bonds will be required at the signing of the contract in an amount not less than One Hundred (100%) percent of the contract price. Insofar as practical, the order of work will be as scheduled by the Contractor and approved by the ASPA Project Manager. The Contractor is required to submit a schedule detailing the sequence of work and time frame for Contractor's activities within 10 calendar days of receipt of the Notice to Proceed. All questions about the meaning or intent of the Contract Documents shall be submitted in writing to the ASPA Project Manager, Mike Thompson, at mike.thompson@alports.com. The right is reserved, as the interest of the Alabama State Port Authority may require, to reject any and all bids and to waive informalities in bids received. The Contractor Will Be Required to Commence Work Under This Contract in Accordance With General Provisions Article 90-02 (Notice to Proceed), to Prosecute Said Work With Faithfulness and Energy, and to Complete the Entire Project Within 180 Calendar Days After Receipt of Notice to Proceed. No proposal will be considered from any Contractor unless he is licensed to do work in the State of Alabama and has complied with the requirements of Paragraph SP-04 of the Special Provisions.

Award

Warehouse / Distribution

$2,000,000.00

Public - State/Provincial

Renovation

6

5

7

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
38
Bidding Soon
491
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 1, 2024

img_map_placeholder

Multiple Locations, Mobile, AL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.