BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Maplewood, Minnesota. Completed plans call for site work for a water / sewer project.

This Contract consists of Cured In Place Pipe (CIPP) lining of sanitary sewer main, lateral reinstatements, trimming of protruding taps, traffic control, bypass pumping, residential notifications, and all appurtenances required to completely reline the sections of existing sanitary sewer pipe as shown on the drawings included in these specifications. Unless otherwise noted, all pipe sections shall be considered fully deteriorated. 2024 Sewer Lining Project 24-06 Construction Location: Various locations in Roseville and Falcon Heights in Ramsey County, Minnesota. Segment 1 shall be completed by June 6, 2024. Remaining shall be completed by August 30, 2024. Expected Award Date:04/08/2024 Project Start Date:03/18/2024 Construction Start Date:04/29/2024 Construction End Date:09/30/2024 A certified check or proposal bond in the amount of not less than 10% percent of the total amount bid, drawn in favor of the City of Roseville shall accompany each bid. This can be submitted either electronically with your bid through BidVAULT or submitted via paper copy with the other required bidding documents at or before the time of the bid opening

Bid Results

Water / Sewer

$1,086,352.00

Public - City

Site Work

28

8

4

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
84
Bidding Soon
832
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

April 22, 2024

img_map_placeholder

Multiple Locations, Maplewood, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.