Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Streamwood, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.
Prequalification: State of Illinois, Department of Transportation, Contractor Pre-Qualification and Subcontractor Pre-Qualification/Registration is not required, however, preferred. References: All bidders must submit with their bid, a resume of three (3) similar projects performed; enumerated as to location, type of work, approximate completion date, and contact information for the Owner, supervising engineering, or architectural firm. Any bid submitted that fails to comply with this provision may be cause for rejection. Subcontracting of Work: Subcontracting portions of the work will be allowed pursuant to Section 108.01 of the "Standard Specifications for Road and Bridge Construction", Illinois Department of Transportation, latest edition. The Owner reserves the right to reject any Bidder or subcontractor who, in the opinion of the Owner, does not have adequate experience, personnel or equipment to perform the work in a timely, efficient, and satisfactory manner. Rejection of Bids: The Owner reserves the right to accept or reject any bid, to award all or part of a Contract, and to make such awards as are in the best interests of the District. Any such decision shall be considered final. Factors other than price which will be considered in awarding or rejecting bids shall include the results of reference Contracts, and the ability of the bidder to satisfactorily perform the work proposed in accordance with the Contract Documents. Location of Work: The park is located at 1010 Woodland Heights Boulevard in the Village of Streamwood, Illinois, Cook County 60107. Description of Work: The work for which proposals are invited will consist of, in general, but shall not be limited to, the following: This project involves the removal of the existing sidewalk and HMA pavement; earth excavation; installation of new sidewalk, PCC pavement and HMA pathways; demolition of existing playground and equipment; installation of new playground equipment; temporary tree protection measures; rain garden installation; site landscape restoration; and other appurtenant work. Bid Security: Bid security in the form of a Bid Bond, Bank Cashier's Check or Certified Check in the amount of ten (10) percent of the total bid made payable to Streamwood Park District shall accompany the bid. Parties: References to 'Owner', 'District', 'Board', 'Executive Board, or 'Department' within the Project Manual and all related or specified publications as indicated herein and as part of this Contract, shall mean Streamwood Park District. Construction Schedule: The Contractor shall commence the work to be performed under this contract, 10 days following the execution of the contract. The work shall be prosecuted in such a manner and with such a supply of materials, equipment and labor as considered necessary to ensure its completion according to the time specified in the contract. The anticipated start date for this project is Monday, April 29, 2024. Regardless of the actual start date, all work shall be completed including punch list items and landscape restoration by Friday, July 26, 2024. No work shall commence until all applicable permit requirements are fulfilled. Different completion dates will apply to the specialty landscape items such as the seeding and plantings for the Butterfly Garden and Rain Garden. In case of failure to complete the work on time by the completion date, the provisions of Article 108.09 of the Standard Specifications shall apply. Submission of a bid shall be conclusive assurance and warrant the bidder has examined the plans and understands all requirements for the performance of the work. The bidder will be responsible for all errors in the proposal resulting from failure or neglect to conduct an in-depth examination. The District will, in no case, be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the bidder. The bidder shall take no advantage of any error or omission in the proposal and advertised contract. Permission will be given to a bidder to withdraw a proposal if the bidder makes the request in writing before the time for opening proposals. This project is being financed, in part, with funds from the Illinois Department of Natural Resources, "Open Space Lands Acquisition & Development" (OSLAD) grant program. Section 3 businesses and minority/women-owned businesses are encouraged to bid on this project. Contract bidders are encouraged to utilize Section 3 businesses and minority/women-owned businesses as subcontractors for this project. Federal prevailing wage requirements apply to this contract. The successful bidder and all Subcontractors shall be required to conform to the labor standards set forth in the Contract Documents.
Post-Bid
Sidewalks / Parking Lot
$400,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2024
April 29, 2024
1010 Woodland Heights Blvd, Streamwood, IL
Related To This Project
Streamwood, IL
Bid Date: Mar 22 2024
Streamwood, IL
Bid Date: Mar 28 2024
Streamwood, IL
Bid Date: Apr 02 2024
Streamwood, IL
Bid Date: Apr 02 2024
Streamwood, IL
Bid Date: Apr 09 2024
Streamwood, IL
Bid Date: Apr 18 2024
Streamwood, IL
Bid Date: Aug 30 2024
Streamwood, IL
Bid Date: Sep 18 2024
Streamwood, IL
Bid Date: Feb 20 2024
Streamwood, IL
Bid Date: Feb 06 2024
Streamwood, IL
Bid Date: Jun 14 2019
Streamwood, IL
Bid Date: Feb 21 2024
Streamwood, IL
Bid Date: Jan 24 2024
Streamwood, IL
Bid Date: Sep 20 2024
Streamwood, IL
Bid Date: Dec 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.