Site work and paving for a mixed-use development in Bountiful, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Sealed proposals will be received at the office of the City Engineer, 795 South Main St., Bountiful, Utah for: 2024 300 South Street Reconstruction Project Question Submission Close Date 3/14/2024 2:00 PM MDT Work included in this Construction Contract includes furnishing all labor, materials and equipment to reconstruct the existing asphalt pavement section on 300 South Street from the east side of the Main Street intersection to the west side of the 400 East Street intersection. The project will also include the replacement of curb, gutter, sidewalk, drive approaches, and storm drain at multiple locations. Bidders are invited to bid on Construction Contract known as: 2024 300 S STREET RECONSTRUCTION PROJECT The projects is located on 300 South Street, from 200 W to Main Street and on 400 South Street, from Main Street to 400 E in Bountiful, and is identified on the title sheet for the project "2024 300 S STREET RECONSTRUCTION PROJECT". The work to be performed generally consists of pulverizing the existing pavement section, excavation, grading, asphalt paving and removal and replacement of existing curb, gutter, sidewalk and drive approaches. The estimated cost of the work of the Work is: $644,484.00 For information about the award of this Construction Contract, contact: Brad Clawson at the Bountiful City Engineering Department, (801) 298-6125. Each bid must be submitted on the form provided as a part of the Contract Documents and shall be accompanied by a certified check, cashier's check or bid bond from a surety company, acceptable to Bountiful City Council, all made payable to City of Bountiful in an amount equal to at least five percent (5%) of the bid. Said check or bid bond shall be given as a guarantee that the bidder will execute the contract in conformity with the form of contract included in the Contract Documents, and furnish a performance bond within fifteen (15) days after notification of the award of the contract to the successful bidder. Bountiful reserves the right to reject any or all bids, or any part of any bid or to waive any informality in any bid as its best interests may appear. A decision on the rejection of any or all bids or the award of a contract will be made within seven (7) days after the bids are opened. A Pre-Bid Conference will not be held. The Work will be Substantially Complete by September 15, 2024. The OWNER reserves the right to reject any or all bids or to waive any informality or technicality in any bid if deemed to be in the best interest of the OWNER. Question Deadline 03/12/2024. All requests for interpretation of the Contract Documents shall be made in writing and delivered to the ENGINEER no later than seven (7) calendar days prior to opening of Bids. In the ENGINEER's discretion, ENGINEER will send the written interpretation to all persons receiving a set of Bid Documents in the form of an Addendum. If the ENGINEER does not respond to a Bidder's request for interpretation the Bidder shall comply with the intent and terms of the Contract Documents No oral interpretations shall be made to any Bidder. The OWNER shall not be responsible for or bound by any statements, interpretations, explanations, representations, conclusions or assumptions made by any party, whether oral or written, except for written statements that are issued in an Addendum by the ENGINEER to all prospective bidders. Anticipated date of Notice to Proceed: April 1, 2024. Required date of Start of Construction: April 15, 2024. Prior to OWNER executing the Agreement, CONTRACTOR shall file with the OWNER a good and sufficient performance Bond and a payment Bond, each in the sum of not less than 100 percent of the Contract Price.
Award
Roads / Highways
$808,710.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2024
April 15, 2024
300 S, Bountiful, UT
Related To This Project
Bountiful, UT
Bid Date: Apr 01 2024
Bountiful, UT
Bid Date: May 30 2024
Bountiful, UT
Bid Date: Jun 20 2024
Bountiful, UT
Bid Date: Jul 02 2024
Bountiful, UT
Bid Date: Jul 09 2024
Bountiful, UT
Bid Date: Aug 01 2024
Bountiful, UT
Bid Date: Jul 22 2024
Bountiful, UT
Bid Date: Aug 13 2024
Bountiful, UT
Bid Date: Mar 05 2024
Bountiful, UT
Bid Date: Feb 27 2024
Bountiful, UT
Bid Date: Feb 20 2024
Bountiful, UT
--
Bountiful, UT
Bid Date: Jan 23 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.